Skip to main content
Apollo NZ Global

SPORT + KNOWLEDGE WORKBOOK

Pickleball Academy

This workbook mirrors the live Academy. Saved module decisions are inserted automatically; empty modules retain note space for workshops, meetings or site visits.
SPORT + KNOWLEDGE

Pickleball Academy

Court, club and venue planning workbook

LEARN · PLAN · PLAYAn Apollo NZ Global InitiativeReviewed September 2026

How to use this workbook

Work through only the modules relevant to the project. Record confirmed decisions, unresolved questions and information still needed. The live Academy can save the same decisions into Your Facility Plan and My Apollo Project.

This is a planning workbook, not a construction drawing, professional design, accreditation or approval document.

01
MODULE 01

Understand the playing court and planning envelope

WHAT YOU NEED TO DECIDE

Separate the 20 × 44 ft playing rectangle from the larger clear area needed for safe, practical use.

INFORMATION TO COLLECT

What are the playing dimensions and non-volley zones?

How much clear space is available beyond the lines?

Is the project one court, multiple courts or a shared-use layout?

RECORDED DECISION / NOTES
02
MODULE 02

Set run-off, circulation and court spacing

WHAT YOU NEED TO DECIDE

Plan space around the court for movement, entry, waiting, adjacent courts and operational flow.

INFORMATION TO COLLECT

How much run-off is available at ends and sidelines?

How will players enter and leave without crossing active play?

Where will waiting players and spectators sit?

RECORDED DECISION / NOTES
03
MODULE 03

Assess conversions and existing assets

WHAT YOU NEED TO DECIDE

Understand whether an existing tennis court, hall or other hard-surface asset can support pickleball without creating layout conflicts.

INFORMATION TO COLLECT

What is the existing surface and condition?

Which existing lines, fencing and drainage can be retained?

Is the conversion temporary, shared-use or permanent?

RECORDED DECISION / NOTES
04
MODULE 04

Check the base and drainage before flooring

WHAT YOU NEED TO DECIDE

Confirm slab or asphalt stability, flatness, cracks, moisture, contamination and water management.

INFORMATION TO COLLECT

Is the base flat, stable, clean and dry enough?

Are cracks, joints or ponding present?

What repair or preparation is required before the finish?

RECORDED DECISION / NOTES
05
MODULE 05

Select the surface pathway

WHAT YOU NEED TO DECIDE

Compare modular tile and roll-format systems around drainage, repair, portability, seams, maintenance and playing feel.

INFORMATION TO COLLECT

Is the court indoor, outdoor or temporary?

Is modular repair or continuous surface feel more important?

How will seams, storage, drainage and maintenance be managed?

RECORDED DECISION / NOTES
06
MODULE 06

Plan nets, dividers and ball containment

WHAT YOU NEED TO DECIDE

Coordinate permanent or portable net systems with court separation, gates, fencing and ball-control requirements.

INFORMATION TO COLLECT

Permanent or portable nets?

Are divider barriers needed between adjacent courts?

Where do gates and containment sit relative to run-off?

RECORDED DECISION / NOTES
07
MODULE 07

Coordinate lighting and acoustics

WHAT YOU NEED TO DECIDE

Treat visibility, glare, operating hours and repeated impact noise as part of the facility brief from the start.

INFORMATION TO COLLECT

What hours and level of play drive the lighting requirement?

Are homes or sensitive receivers nearby?

Does an indoor venue need acoustic treatment or professional review?

RECORDED DECISION / NOTES
08
MODULE 08

Choose shade or covered-court pathways

WHAT YOU NEED TO DECIDE

Match weather protection to climate, operating hours, clear height, court count and project scale.

INFORMATION TO COLLECT

Is the priority sun, rain, wind or year-round use?

Does the project need shade, a fixed cover or a fully enclosed/air-supported option?

How will lighting and ventilation work under the cover?

RECORDED DECISION / NOTES
09
MODULE 09

Plan player and spectator infrastructure

WHAT YOU NEED TO DECIDE

Add benches, waiting areas, storage, amenities and spectator space around how the venue will actually operate.

INFORMATION TO COLLECT

Where do players wait between games?

What storage and amenity space is required?

How will spectators be separated from active circulation?

RECORDED DECISION / NOTES
10
MODULE 10

Scale from one court to a commercial venue

WHAT YOU NEED TO DECIDE

Coordinate court count, circulation, acoustics, lighting, technology, amenities and operating capacity for larger facilities.

INFORMATION TO COLLECT

What court count is viable for the site and operating model?

How will bookings, changeovers and waiting space work?

What building, egress and accessibility issues apply indoors?

RECORDED DECISION / NOTES
11
MODULE 11

Understand portable and tournament formats

WHAT YOU NEED TO DECIDE

Plan court rolls, setup labour, storage, portable nets and divider systems for halls, events and temporary programmes.

INFORMATION TO COLLECT

How often will the courts be installed and removed?

Can large flooring rolls be handled and stored safely?

Would semi-permanent installation reduce repeated labour?

RECORDED DECISION / NOTES
12
MODULE 12

Build the pickleball project brief

WHAT YOU NEED TO DECIDE

Combine dimensions, base, surface, equipment, lighting, containment, cover and venue requirements into one review package.

INFORMATION TO COLLECT

Are the site dimensions and base condition documented?

Which systems are required now and which are future stages?

What local works, approvals and specialist design remain outside product supply?

RECORDED DECISION / NOTES

Facility Plan summary

Use this page to consolidate the project before moving into the Sports Project Brief.

Confirmed decisions
Items still to verify
Local professional / approval items
Next planning action
SPORT + KNOWLEDGEapollonzglobal.com/sport-knowledgePlanning guidance · Supply-only project pathway
Return to Academy
Project