Netball Academy
Global court and facility planning workbook
How to use this workbook
Work through only the modules relevant to the project. Record confirmed decisions, unresolved questions and information still needed. The live Academy can save the same decisions into Your Facility Plan and My Apollo Project.
This is a planning workbook, not a construction drawing, professional design, accreditation or approval document.
Confirm the current World Netball court reference
Start with the current playing geometry, thirds, goal circles and post locations for the intended level of play.
□ School, club, community or competition venue?
□ Which current World Netball or national requirements apply?
□ What complete site area is available?
Define users, teams and operating model
Plan the court around training, games, school use, tournaments, community access and peak occupancy.
□ How many teams use the facility?
□ Is the court shared?
□ What operating hours apply?
Check the base and drainage
Review cracking, levels, ponding, moisture and edge conditions before the sports surface is selected.
□ Concrete, asphalt or another base?
□ Does water drain away correctly?
□ Are repairs needed first?
Choose the netball surface pathway
Match traction, cushioning, ball response, outdoor exposure, repair and maintenance to the user group and base.
□ Indoor or outdoor?
□ Dedicated or shared-use court?
□ Who will maintain the surface?
Plan posts and goal-circle interfaces
Coordinate post type, foundations or sockets, padding, goal circles and safe access before final surfacing.
□ Fixed, socketed or portable posts?
□ What support or footing is required?
□ How are posts stored if removed?
Protect run-off and player movement
Keep fencing, benches, gates, spectators and equipment outside the active movement envelope.
□ What run-off is required locally?
□ Where do teams enter?
□ Do gates or benches conflict with player movement?
Plan lighting around the whole court
Coordinate poles, aiming, glare and operating hours around post positions, run-off and nearby uses.
□ Training or competition lighting?
□ Are there nearby homes or roads?
□ Can poles be kept clear of player movement?
Plan fencing and ball containment
Use containment, gates and internal separation to support the site without creating impact hazards.
□ Is full perimeter fencing needed?
□ Where should gates sit?
□ Is the court beside roads or other sports?
Plan team, official and spectator zones
Coordinate benches, score operation, waiting, spectators and accessible viewing around the court.
□ How many spectators are expected?
□ Where do substitutes and officials sit?
□ Is shade or covered waiting required?
Plan shared use with basketball and school sport
Control line hierarchy and removable equipment when netball shares with basketball, futsal, tennis or school recreation.
□ Which sport is primary?
□ Can posts and hoops coexist safely?
□ What line colours avoid confusion?
Plan maintenance and future resurfacing
Build cleaning, coating renewal, line remarking, post inspection and repairs into the facility lifecycle.
□ Who owns maintenance?
□ How will surface repairs be handled?
□ Can future resurfacing retain shared-use flexibility?
Build the netball project brief
Bring rules reference, base, surface, posts, lighting, containment, spectators and destination responsibilities into one package.
□ Are dimensions and site conditions documented?
□ Is the intended standard clear?
□ What local civil, electrical and approval work remains?
Facility Plan summary
Use this page to consolidate the project before moving into the Sports Project Brief.
