Skip to main content
Apollo NZ Global

SPORT + KNOWLEDGE WORKBOOK

Multi-Sport Court Academy

This workbook mirrors the live Academy. Saved module decisions are inserted automatically; empty modules retain note space for workshops, meetings or site visits.
SPORT + KNOWLEDGE

Multi-Sport Court Academy

Shared-use court planning workbook

LEARN · PLAN · PLAYAn Apollo NZ Global InitiativeReviewed September 2026

How to use this workbook

Work through only the modules relevant to the project. Record confirmed decisions, unresolved questions and information still needed. The live Academy can save the same decisions into Your Facility Plan and My Apollo Project.

This is a planning workbook, not a construction drawing, professional design, accreditation or approval document.

01
MODULE 01

Define the sport mix and programme hierarchy

WHAT YOU NEED TO DECIDE

Start with the activities the court must support, then decide which are primary, secondary and occasional so the layout does not become visually or operationally confused.

INFORMATION TO COLLECT

Which sports must the court support every week?

Which sport should control the primary line hierarchy?

Is the court for PE, club use, public recreation or mixed programming?

RECORDED DECISION / NOTES
02
MODULE 02

Establish the full court and circulation footprint

WHAT YOU NEED TO DECIDE

Plan the usable site around playing areas, run-off, entries, waiting space, equipment movement and future changes rather than only the painted court lines.

INFORMATION TO COLLECT

What is the clear site after boundaries, buildings and obstacles?

Where will users enter, wait and change activities?

Is there enough surrounding space for safe circulation and future adaptation?

RECORDED DECISION / NOTES
03
MODULE 03

Check the base and drainage first

WHAT YOU NEED TO DECIDE

Confirm substrate stability, levels, cracking, moisture and water management before choosing the shared-use surface.

INFORMATION TO COLLECT

Is the base concrete, asphalt or another hard substrate?

Are ponding, movement or failed repairs present?

Where will water go after it reaches the court?

RECORDED DECISION / NOTES
04
MODULE 04

Choose the surface around the sport mix

WHAT YOU NEED TO DECIDE

Compare modular tile, resilient indoor systems and other surface families around the combined needs of the sports rather than one activity in isolation.

INFORMATION TO COLLECT

Indoor, outdoor or covered?

Which sports place the strongest demands on traction, cushioning and ball response?

How important are modular repair, drainage and later reconfiguration?

RECORDED DECISION / NOTES
05
MODULE 05

Design a clear line-marking hierarchy

WHAT YOU NEED TO DECIDE

Use line colour, prominence and court overlays so the shared surface remains understandable when several sports occupy the same footprint.

INFORMATION TO COLLECT

Which court markings must be easiest to read?

Can secondary lines be visually quieter without becoming confusing?

Will portable markings or temporary overlays be needed for occasional sports?

RECORDED DECISION / NOTES
06
MODULE 06

Coordinate hoops, posts, nets and removable equipment

WHAT YOU NEED TO DECIDE

Resolve fixed, socketed, wall-mounted, portable and removable equipment around shared use and storage before the surface plan is frozen.

INFORMATION TO COLLECT

Which equipment must stay in place permanently?

What can be removable to protect flexibility?

Where will portable or seasonal equipment be stored?

RECORDED DECISION / NOTES
07
MODULE 07

Plan lighting for the whole shared-use court

WHAT YOU NEED TO DECIDE

Coordinate pole positions, aiming, glare, uniformity and operating hours around all sports and the wider site.

INFORMATION TO COLLECT

Which sports and user levels drive the lighting brief?

Do poles or luminaires conflict with run-off, fencing or spectators?

Are nearby homes, roads or boundaries sensitive to spill light?

RECORDED DECISION / NOTES
08
MODULE 08

Plan perimeter, containment and access

WHAT YOU NEED TO DECIDE

Coordinate fencing, gates, ball containment and court separation around the most demanding ball trajectories and the movement of different user groups.

INFORMATION TO COLLECT

Which sports require the most containment?

Where should gates sit without cutting through active run-off?

Does the court need internal dividers for simultaneous activities?

RECORDED DECISION / NOTES
09
MODULE 09

Design for schools, clubs and community use

WHAT YOU NEED TO DECIDE

Match the court layout to supervision, timetable changes, public access, age groups and the way the site will actually be operated.

INFORMATION TO COLLECT

Who uses the court during school, club and public hours?

How will equipment changeovers be managed?

What supervision, storage and access arrangements are needed?

RECORDED DECISION / NOTES
10
MODULE 10

Include spectators, accessibility and support spaces

WHAT YOU NEED TO DECIDE

Plan inclusive access, benches, waiting areas, service routes and spectator positions as part of the shared recreation environment.

INFORMATION TO COLLECT

Can users reach the court without crossing active play?

Where will accessible users and spectators be accommodated?

Are seating, shade, drinking water or storage required nearby?

RECORDED DECISION / NOTES
11
MODULE 11

Plan maintenance, resurfacing and future change

WHAT YOU NEED TO DECIDE

Choose a facility pathway that can be cleaned, repaired, re-marked and adapted as sports programmes change over time.

INFORMATION TO COLLECT

Who maintains the surface and equipment?

Can damaged areas or components be replaced locally?

How easy will it be to change markings or sport priorities later?

RECORDED DECISION / NOTES
12
MODULE 12

Build the multi-sport project brief

WHAT YOU NEED TO DECIDE

Bring sport mix, site, base, surface, markings, equipment, lighting, containment and supporting infrastructure into one coordinated project brief.

INFORMATION TO COLLECT

Which sports and priorities are confirmed?

Are dimensions, base condition and site constraints documented?

What local civil, electrical, installation and approval responsibilities remain outside supply?

RECORDED DECISION / NOTES

Facility Plan summary

Use this page to consolidate the project before moving into the Sports Project Brief.

Confirmed decisions
Items still to verify
Local professional / approval items
Next planning action
SPORT + KNOWLEDGEapollonzglobal.com/sport-knowledgePlanning guidance · Supply-only project pathway
Return to Academy
Project