Skip to main content
Apollo NZ Global

SPORT + KNOWLEDGE WORKBOOK

Facility Planning Academy

This workbook mirrors the live Academy. Saved module decisions are inserted automatically; empty modules retain note space for workshops, meetings or site visits.
SPORT + KNOWLEDGE

Facility Planning Academy

Complete sports-facility planning workbook

LEARN · PLAN · PLAYAn Apollo NZ Global InitiativeReviewed September 2026

How to use this workbook

Work through only the modules relevant to the project. Record confirmed decisions, unresolved questions and information still needed. The live Academy can save the same decisions into Your Facility Plan and My Apollo Project.

This is a planning workbook, not a construction drawing, professional design, accreditation or approval document.

01
MODULE 01

Define the sport, users and operating model

WHAT YOU NEED TO DECIDE

Start with who will use the facility, how often, at what level and whether it is school, club, public, private, resort or commercial.

INFORMATION TO COLLECT

Which sports and user groups must the facility serve?

What intensity, operating hours and supervision model are expected?

Is the facility dedicated, shared-use or staged for future growth?

RECORDED DECISION / NOTES
02
MODULE 02

Read the site and establish the usable footprint

WHAT YOU NEED TO DECIDE

Separate the playing rectangle from run-off, circulation, access, storage, spectators and future expansion.

INFORMATION TO COLLECT

What is the actual clear site after setbacks and obstacles?

How will players, staff and spectators move through the facility?

What area should be protected for later expansion?

RECORDED DECISION / NOTES
03
MODULE 03

Understand the base and drainage

WHAT YOU NEED TO DECIDE

Confirm that the substrate, levels, cracking, moisture and water path are suitable before choosing the finished surface.

INFORMATION TO COLLECT

Is the base stable, hard, flat and suitable for the intended system?

Where does water go after it reaches the playing area?

What repairs or local civil works must happen first?

RECORDED DECISION / NOTES
04
MODULE 04

Choose the surface around the whole project

WHAT YOU NEED TO DECIDE

Compare surface families through sport, environment, drainage, maintenance, repair and operating model rather than one specification.

INFORMATION TO COLLECT

Indoor, outdoor, covered or temporary?

What playing response and comfort matter for the sport mix?

How will the surface be cleaned, repaired and replaced?

RECORDED DECISION / NOTES
05
MODULE 05

Plan lighting before poles and structures are fixed

WHAT YOU NEED TO DECIDE

Coordinate court geometry, glare, spill, mounting locations, maintenance access and operating hours.

INFORMATION TO COLLECT

What level of play and operating hours drive the lighting brief?

Where can poles or fixtures sit without affecting play or circulation?

Are neighbours, glare or spill-light constraints relevant?

RECORDED DECISION / NOTES
06
MODULE 06

Coordinate equipment, fencing and containment

WHAT YOU NEED TO DECIDE

Resolve nets, posts, dividers, gates and ball control before the finished layout is frozen.

INFORMATION TO COLLECT

Which equipment is permanent, removable or portable?

Where do gates, post sockets and barriers interact with run-off?

What storage or handling is needed for movable systems?

RECORDED DECISION / NOTES
07
MODULE 07

Decide whether the facility needs weather protection

WHAT YOU NEED TO DECIDE

Treat shade, canopies, air-supported structures and covered-sport pathways as part of the footprint, not a late add-on.

INFORMATION TO COLLECT

Which weather conditions are reducing usable hours?

What clear height and covered footprint are required?

How do structure, lighting, ventilation and local approvals interact?

RECORDED DECISION / NOTES
08
MODULE 08

Plan spectators, seating and venue infrastructure

WHAT YOU NEED TO DECIDE

Match seating type, capacity, circulation and weather protection to the actual venue model.

INFORMATION TO COLLECT

Who is watching and for how long?

Is seating permanent, retractable, portable or event-based?

How will circulation, egress and accessible positions be coordinated?

RECORDED DECISION / NOTES
09
MODULE 09

Design for access, inclusion and everyday circulation

WHAT YOU NEED TO DECIDE

Bring accessibility, safe movement, supervision and service access into the early facility layout.

INFORMATION TO COLLECT

Can users reach the playing and spectator areas without conflicts?

Are accessible routes and positions integrated rather than added later?

Can maintenance and emergency access occur without disrupting normal use?

RECORDED DECISION / NOTES
10
MODULE 10

Plan operations, storage and maintenance

WHAT YOU NEED TO DECIDE

Specify how the facility will be cleaned, repaired, stored, inspected and kept usable after opening.

INFORMATION TO COLLECT

Who owns day-to-day maintenance?

What spares, cleaning equipment and storage are needed?

Can damaged components or surface areas be repaired locally?

RECORDED DECISION / NOTES
11
MODULE 11

Coordinate sports technology and capture

WHAT YOU NEED TO DECIDE

Plan cameras, power, sightlines and data requirements before walls, poles and spectator zones are fixed.

INFORMATION TO COLLECT

What is the purpose: recording, streaming, coaching or scoring?

Where can a camera see the full playing area safely?

What power, network and mounting provisions are needed?

RECORDED DECISION / NOTES
12
MODULE 12

Turn the decisions into a project brief

WHAT YOU NEED TO DECIDE

Collect the site, dimensions, use, system preferences and unresolved questions into one brief for the next project stage.

INFORMATION TO COLLECT

Which decisions are confirmed and which still need specialist input?

What drawings, photos and measurements should accompany the brief?

What supply, local-work and approval responsibilities must be made explicit?

RECORDED DECISION / NOTES

Facility Plan summary

Use this page to consolidate the project before moving into the Sports Project Brief.

Confirmed decisions
Items still to verify
Local professional / approval items
Next planning action
SPORT + KNOWLEDGEapollonzglobal.com/sport-knowledgePlanning guidance · Supply-only project pathway
Return to Academy
Project