BUILDING SYSTEMS · LOGISTICS PLANNER
Check volume and payload limits before the building programme is frozen.
Enter the programme's own packed dimensions and transport assumptions to estimate whether volume or payload is likely to control the container count. This is logistics arithmetic, not a packing plan.
Entered logistics
Use exact supplier packing data when it becomes available.
FROM FACTORY TO SITE
