Skip to main content
Apollo NZ GlobalStart Project Brief

BUILDING SYSTEMS · CLIMATE + ENVELOPE

Climate and envelope planning for international prefab housing.

The same factory house should not be assumed suitable for a tropical island, desert inland site and cold climate without changing the envelope and services.

SHORT ANSWER

Specify the envelope from the destination climate and code pathway.

Define temperature, humidity, solar exposure, rainfall, wind, coastal salt, heating/cooling strategy and local energy/building requirements. Then qualify wall, roof, insulation, glazing, ventilation and moisture-control details for the chosen building system.

KEY PROJECT POINTS

What should drive the decision.

These are project inputs, not substitute engineering or automatic product approvals.

01

Insulation values alone do not describe thermal performance.

02

High humidity increases condensation and mould risk.

03

Hot climates need solar/shading and cooling strategy.

04

Cold climates need thermal-bridge and vapour-control review.

05

Coastal sites require corrosion-resistant materials and maintenance.

06

Wind-driven rain can control façade and opening details.

01

Build a climate brief

Use actual project climate/exposure rather than a generic regional label.

02

Coordinate insulation and ventilation

Better insulation without appropriate ventilation/moisture design can create condensation problems.

03

Protect openings and joints

Windows, doors, module joints, roof edges and service penetrations are common envelope weak points.

04

Match services to envelope

HVAC sizing and comfort depend on the actual wall/roof/glazing build-up and occupancy.

PROJECT INPUTS

What to have ready before asking for the exact system.

A stronger brief shortens the gap between product interest and a useful technical/commercial response.

01

Destination

02

Temperature range

03

Humidity

04

Solar exposure

05

Rainfall

06

Design wind

07

Coastal/salt

08

Insulation target

09

Glazing

10

Ventilation

11

HVAC strategy

12

Local energy/building requirements

EVIDENCE BOUNDARY

Envelope claims must match the exact wall, roof and glazing build-up.

Verify materials, insulation, thermal/fire data, windows/glazing, seals and corrosion protection for the exact selected building. Brand-level marketing is not enough.

Building Systems Authority CentreEvidence, drawing and specification framework for international building systems.

FAQ

Questions project teams usually need answered.

Can one standard prefab house be used in every climate?

No. Structure, envelope, glazing, services and corrosion protection may need destination-specific changes.

Is more insulation always better?

Not by itself. Moisture, ventilation, thermal bridging and HVAC need to work together.

Is CAIRNHUS a New Zealand H1 home system?

No. CAIRNHUS is US-focused and should not be presented as a New Zealand H1-compliant home system.

Project