Base condition comes first
Crack repair, levelling, drainage correction or local civil works can materially change the project cost. A court in sound condition is a different project from one with active movement or significant ponding.

Sports flooring · practical guide
Court resurfacing budgets are often compared using a simple square-metre rate, but the final project cost is shaped by much more than the playing surface itself.

Crack repair, levelling, drainage correction or local civil works can materially change the project cost. A court in sound condition is a different project from one with active movement or significant ponding.
Modular tile, roll-out flooring and other surface pathways have different preparation, edging, seam and installation requirements. Comparing only material thickness can hide those differences.
Nets, posts, fencing work, lighting, line changes, storage and camera technology may sit outside the base flooring price but are often part of the facility users actually expect.
Remote delivery, depot access, storage and whether the project is completed in one stage or several can affect the final budget. A good estimate separates product, freight and local works so each part can be managed clearly.
Move from guide to project