RHELGAN · Water Project Brief

Start with the site, source and demand. Unknown details can stay unknown.

This brief is designed to establish the right technical questions before storage, treatment or pumping is fixed. A project does not need finished engineering to start, but country, intended use, water source and approximate users materially improve the first review.

01SOURCE
02ANALYSIS
03STORAGE
04TREATMENT
05PUMPING
06DISTRIBUTION

Route 01 · Documents ready

I already have a water analysis, RFP, site plan or hydraulic brief.

Upload the documents first and keep later project information under the same Apollo reference.

Upload water documents

Route 02 · Early-stage water requirement

I know the project and source, but the final system has not been specified.

Use the structured brief below. RHELGAN can then define the next storage, treatment, pumping and documentation questions.

Open Water Brief

Useful starting information

Five inputs make the first technical review much stronger.

01

Destination + site

Country, site location, climate, exposure, topography, access and any known local water or public-health requirements.

02

Source

Rainwater, bore, surface, municipal, delivered, brackish, seawater or mixed source — plus reliability and available flow.

03

Demand + storage

People or users, intended water use, daily demand if known, desired autonomy and any existing or required storage volume.

04

Water quality

Upload a laboratory analysis where available. Treatment is selected from the actual source-water condition and required finished-water use.

05

Power + pumping

Grid, generator, solar or hybrid power; gravity or pumped distribution; elevations, pressure and solar-pumping interest.

Structured water intake

Turn the requirement into one controlled RHELGAN water brief.

01

Project + contact

Country, application and a contact point are enough to begin.

02

Demand + source water

Unknown is acceptable. Treatment is selected from the source-water condition and required finished-water quality.

03

Site + system architecture

These inputs define storage material, tank geometry, treatment, pumping and project interfaces.

04

Project description

Tell us the outcome, what is already known and what still needs to be resolved.

Submitting a brief creates no purchase commitment. Final storage, treatment, pumping and distribution are selected from actual demand, source-water quality, site conditions and destination requirements.

Scope control

The form starts the specification. It does not replace water, hydraulic, structural or public-health engineering.

Final demand, source-water quality, storage volume, treatment process, tank structure, foundations, pumps, electrical systems, pipework, installation, commissioning, operating responsibilities and destination requirements remain project-specific unless expressly included in the written Apollo scope.