Skip to main content
Apollo NZ GlobalUpload project documents

Housing · RHELGAN Standard Configuration

Compact Two-Module Home

Compact permanent housing, key-worker housing, remote-community programmes, staff housing and selected social / affordable housing where a long-format standard product gives a cleaner solution than multiple short modules.

Planning referenceReference geometry · 12192 × 2438 × 2896 mm overallModule count2 modulesPlanning area59 m² stated reference area

Intended use

What this configuration is for.

Compact permanent housing, key-worker housing, remote-community programmes, staff housing and selected social / affordable housing where a long-format standard product gives a cleaner solution than multiple short modules.

Starting room / fixture schedule

Base planning arrangement.

Compact residential layoutLiving / kitchen zoneBathroom / sanitary zoneBedroom arrangement per current reference planCovered outdoor edge shown in reference imagery

Indicative supply pathway

What the supplied building package can include.

Two long-format residential modulesEnvelope and internal finishes to confirmed current standardKitchen / bathroom pathwayDoors, windows and internal services to current product specification

Local / project scope

What remains project- and destination-specific.

FoundationExternal utilitiesDeck / veranda unless includedLocal residential approvalsSite works and installation

Options

Change the standard only where the project needs it.

Key-worker versionRemote-community versionAccessible adaptation subject to width / clearance reviewCoastal / tropical finish packageSevere-weather engineering package

Project information

Include these requirements in your project brief.

Target external + internal clear dimensionsProposed module joining and opening requirementsDoor + window positions and sizesWet-area floor, drain and service interfacesElectrical / plumbing completion scopeFire, thermal, wind / seismic requirements as applicableCoastal / corrosion exposure informationDestination, lifting and receiving requirements

Configuration rules

Standard first. Project-specific where necessary.

This configuration is a public planning pathway rather than a complete technical specification. Final dimensions, structure, services, finishes and options are confirmed against the actual project.

Apollo is supply-only. Final structure, foundations, anchoring, fire, accessibility, services, installation, local engineering and statutory approvals remain project- and destination-specific.

Use this configuration in a real project

Send the quantity, destination and project requirements.

The configuration provides a starting room and capacity pathway. RHELGAN then confirms technical requirements, local interfaces, documentation, freight and quotation basis for the project.

Programme Supply & Procurement Start RHELGAN project brief
Project