Skip to main content
Apollo NZ GlobalUpload project documents

Housing · Apollo Standard Configuration · HA-54

Concept standardManufacturer confirmation pending

Accessible Two-Bedroom Home

Two-bedroom accessible dwelling using the same three-module housing platform as H2-54.

Planning platformApollo wide-module concept grid · nominal 6.0 × 3.0 m planning modules; final manufacturer mapping may use long-format modulesModule countConcept: 3 joined planning modulesPlanning areaApprox. 54 m² gross planning footprint

Intended use

What this configuration is for.

Inclusive housing programmes, key-worker housing, social housing and remote-community projects requiring a repeatable accessible home type.

Starting room / fixture schedule

Base planning arrangement.

2 bedroomsAccessible bathroom planning basisOpen living / dining / kitchenWider internal circulation allowanceAccessible entry / threshold strategyLaundry / storage

Standard manufactured supply

What the factory package can start from.

Three structural modulesResidential envelopeAccessible-layout planning basisPartitions and finishesKitchen / bathroom pathwayDoors / openings selected for the project

Local / project scope

What stays outside the base manufactured package.

Accessible site pathFoundation / finished level relationshipExternal utilitiesLocal accessibility reviewSite works and approvalsInstallation / commissioning

Options

Change the standard only where the project needs it.

Carer / family adaptationCovered accessible verandaEmergency call provisionCoastal / severe-weather package1-bedroom accessible variant

Before commercial freeze

What still has to be confirmed with the selected manufacturer.

Exact external + internal clear dimensionsStructural module joining / opening limitsDoor + window positions and standard sizesWet-area floor, drain and service interfacesElectrical / plumbing factory-completion scopeFire, thermal, wind / seismic evidence as applicableCoastal / corrosion specification where requiredPacking, container quantity, weights and lifting points

Configuration rules

Standard first. Project-specific where necessary.

Final accessible clearances, fixtures and hardware are confirmed against the destination's requirements.

HA-54 should share the same manufacturer structural base as the final H2-54 wherever possible, even if that base differs from the original 6.0 × 3.0 concept grid.

Apollo is supply-only. Final structure, foundations, anchoring, fire, accessibility, services, installation, local engineering and statutory approvals remain project- and destination-specific.

Use HA-54 in a real project

Send the quantity, destination and project requirements.

The standard configuration gives us the starting module count and room schedule. We then confirm the manufacturer platform, technical requirements, local interfaces, documentation, freight and quotation basis.

Programme Supply & Procurement Start project brief
Project