Housing · Apollo Standard Configuration · H4-90

Concept standardManufacturer confirmation pending

Four-Bedroom Family Home

Larger programme house using five joined wide modules for bigger households.

Planning platformApollo wide-module concept grid · nominal 6.0 × 3.0 m planning modules; final manufacturer mapping may use long-format modulesModule countConcept: 5 joined planning modulesPlanning areaApprox. 90 m² gross planning footprint

Intended use

What this configuration is for.

Larger families, multigenerational households and housing programmes requiring a higher-capacity standard dwelling.

Starting room / fixture schedule

Base planning arrangement.

4 bedrooms1–2 bathrooms planning pathwayLiving / dining / kitchenLaundry / utilityExpanded family storageCovered entry / outdoor-living allowance

Standard manufactured supply

What the factory package can start from.

Five structural modulesResidential insulated envelopePartitions and internal finishesKitchen / bathroom pathwaysDoors and windowsElectrical / plumbing pathway

Local / project scope

What stays outside the base manufactured package.

FoundationExternal utilitiesSite worksDeck / veranda unless includedLocal approvalsInstallation / commissioning

Options

Change the standard only where the project needs it.

Second bathroomAccessible bedroom / bathroom suiteCovered outdoor livingCoastal / severe-weather packageAlternative family-room layout

Before commercial freeze

What still has to be confirmed with the selected manufacturer.

Exact external + internal clear dimensionsStructural module joining / opening limitsDoor + window positions and standard sizesWet-area floor, drain and service interfacesElectrical / plumbing factory-completion scopeFire, thermal, wind / seismic evidence as applicableCoastal / corrosion specification where requiredPacking, container quantity, weights and lifting points

Configuration rules

Standard first. Project-specific where necessary.

H4-90 should be used selectively rather than allowing every programme to drift into larger custom dwellings.

A standard wet-area / service core should be preserved wherever practical.

If a manufacturer has a cleaner long-format standard home near this area, use that instead of forcing five 6 m planning modules.

Apollo is supply-only. Final structure, foundations, anchoring, fire, accessibility, services, installation, local engineering and statutory approvals remain project- and destination-specific.

Use H4-90 in a real project

Send the quantity, destination and project requirements.

The standard configuration gives us the starting module count and room schedule. We then confirm the manufacturer platform, technical requirements, local interfaces, documentation, freight and quotation basis.

Programme Supply & Procurement Start project brief
Project