Camps · RHELGAN Standard Configuration

20-Person Remote Camp

Small infrastructure teams, survey / construction crews, remote programme staff and temporary field operations.

Planning referenceCompact export accommodation platform · standard 6.0 × 2.438 m sleeping modules plus wide wet-area / support modulesModule countBase package: 10 twin accommodation modules + 2 amenity modules + 2 support modulesPlanning areaApprox. 218 m² gross module footprint before decks / circulation

Intended use

What this configuration is for.

Small infrastructure teams, survey / construction crews, remote programme staff and temporary field operations.

Starting room / fixture schedule

Base planning arrangement.

20 beds in twin-room basis2 amenity modules1 administration / induction module1 first-aid / welfare moduleShared external circulation / covered links by project

Indicative supply pathway

What the supplied building package can include.

Accommodation modulesAmenity modulesSupport / administration modulesDoors, windows and internal finishesInternal electrical / plumbing pathways by module typePacking and module schedule

Local / project scope

What remains project- and destination-specific.

Camp masterplanFoundations / supportsKitchen / dining unless addedExternal utilitiesFire / egress / sanitary reviewSite roads, drainage and assembly

Options

Change the standard only where the project needs it.

Dining / kitchen moduleLaundry moduleRecreation moduleSecurity moduleSingle-room accommodationMontara expandable support building

Project information

Include these requirements in your project brief.

Target external + internal clear dimensionsProposed module joining and opening requirementsDoor + window positions and sizesWet-area floor, drain and service interfacesElectrical / plumbing completion scopeFire, thermal, wind / seismic requirements as applicableCoastal / corrosion exposure informationDestination, lifting and receiving requirements

Configuration rules

Standard first. Project-specific where necessary.

This configuration is a public planning pathway rather than a complete technical specification. Final dimensions, structure, services, finishes and options are confirmed against the actual project.

Apollo is supply-only. Final structure, foundations, anchoring, fire, accessibility, services, installation, local engineering and statutory approvals remain project- and destination-specific.

Use this configuration in a real project

Send the quantity, destination and project requirements.

The configuration provides a starting room and capacity pathway. RHELGAN then confirms technical requirements, local interfaces, documentation, freight and quotation basis for the project.

Programme Supply & Procurement Start RHELGAN project brief