Amenities · Apollo Standard Configuration · AM-04

Concept standardManufacturer confirmation pending

Changing + Shower Block

Two-module changing and shower building for sport, schools and larger community use.

Planning platformWide modular platform · paired nominal 6.0 × 3.0 m modulesModule count2 joined modulesPlanning areaApprox. 36 m² gross combined footprint

Intended use

What this configuration is for.

Sports grounds, schools, workforce villages and community recreation facilities needing separated dry and wet zones.

Starting room / fixture schedule

Base planning arrangement.

Changing zone with benches4 shower positions starting basis2 WC positions starting basisHand basinsService / cleaner allowance

Standard manufactured supply

What the factory package can start from.

Joined structural modulesChanging-room partitions and benches pathwayWet-area build-upInternal plumbing / electrical pathwayVentilation / extraction allowanceDoors and hardware

Local / project scope

What stays outside the base manufactured package.

Foundation / slab interfaceExternal water / wastewaterHot-water plant unless specifically includedLocal drainageFinal fixture-count and accessibility review

Options

Change the standard only where the project needs it.

Team-room splitOfficials' roomLockersAccessible shower / WCExternal covered entryHigher shower count using additional module

Before commercial freeze

What still has to be confirmed with the selected manufacturer.

Exact external + internal clear dimensionsStructural module joining / opening limitsDoor + window positions and standard sizesWet-area floor, drain and service interfacesElectrical / plumbing factory-completion scopeFire, thermal, wind / seismic evidence as applicableCoastal / corrosion specification where requiredPacking, container quantity, weights and lifting points

Configuration rules

Standard first. Project-specific where necessary.

Sports fixture counts should be matched to the actual team / user numbers.

Additional modules can extend the building without redesigning the core wet-area logic.

Apollo is supply-only. Final structure, foundations, anchoring, fire, accessibility, services, installation, local engineering and statutory approvals remain project- and destination-specific.

Use AM-04 in a real project

Send the quantity, destination and project requirements.

The standard configuration gives us the starting module count and room schedule. We then confirm the manufacturer platform, technical requirements, local interfaces, documentation, freight and quotation basis.

Programme Supply & Procurement Start project brief