Frame + louvre colours
Black, White and Grey standard pathways, with mixed frame / louvre combinations possible. Approved custom finishes such as Flaxpod Matt are extra-cost project options.
Discuss villa programmeCADARN · Fiji + GCC Villa Packages
A developer does not need dozens of pergola variations. Start with a controlled family of CADARN kitsets, then set the colours, operation and accessories that belong to each villa or project type.
Package family
3 × 3 m · Single bay
Compact private terrace, courtyard or poolside zone.
4 × 3 m · Single bay
Larger villa dining or lounge terrace with a clean repeat footprint.
4 × 4 m · Double bay
Square outdoor room for poolside, lounge or hospitality use.
6 × 4 m · Double bay
Maximum CADARN footprint for larger villa terraces while staying inside the kitset system.
Standard options
Black, White and Grey standard pathways, with mixed frame / louvre combinations possible. Approved custom finishes such as Flaxpod Matt are extra-cost project options.
Assign operation type by villa class, project stage or buyer upgrade package.
Create approved options for retractable screens, glass or louvre-wall configurations where compatible.
Keep the manufacturing, powder-coat, coastal, motor and LED warranty pathways consistent across the programme.
Approved project or developer logos can be laser-marked into selected posts where required.
Keep configuration records so later accessories, parts and replacements can be traced to the supplied kitset.
Fiji programme
Confirm guttering, outlets and site drainage discharge before batch manufacture.
Review coating pathway, fixing grade, freshwater cleaning and maintenance by actual salt exposure.
Obtain the site-specific criteria from the local project team. CADARN carries no blanket Fiji cyclone claim.
Plan receiving port, onward island transport, unloading, storage and staged release.
Fiji project team handles foundations, installation, electrical, drainage, local engineering and approvals.
Middle East + GCC programme
Review orientation, surface exposure, control equipment placement and maintenance access.
Set realistic cleaning and operating expectations for moving roof and drainage components.
For marine or salt-exposed projects, apply a separate coastal review rather than assuming an inland specification.
Coordinate power, controls, lighting and drainage before the villa schedule is released.
Local team retains foundation, installation, engineering, approval and building-interface responsibilities.
Important documentation rule
Do not force CADARN into that procurement route. Review ARKEN or another project-manufactured system where the required drawing and submittal scope can be confirmed before tender.
FAQ
They are programme templates built around CADARN standard-scale configurations. Final quotation still confirms operation, colours, accessories, destination, exposure, freight and site responsibilities.
Yes. The purpose is to reduce unnecessary variation, not force every project into four models. A developer can freeze the smaller family that best matches the development.
No. CADARN is supplied as a modular kitset and does not include project-specific CAD, BIM or shop drawings. The local architect, engineer or contractor integrates the selected product into the development documentation. If formal manufacturer drawing deliverables are mandatory, a different architectural system pathway should be reviewed.
No blanket environmental rating is implied. Fiji projects require actual wind or cyclone criteria, exposure and mounting review; GCC projects require heat, UV, dust and site exposure review. Suitability is confirmed against the actual project conditions and available technical evidence.
Next step
Send the country, project type, villa count, terrace sizes, development stages, preferred finishes, operation type and intended enclosure options. Apollo can turn that into a controlled CADARN quotation schedule.