Skip to main content
Apollo NZ GlobalConfigure APERTA

CADARN APERTA · Technical Centre

Plan the retractable roof around the actual support, movement, power and drainage interfaces.

This centre separates confirmed APERTA planning data from the supplier details still being reconfirmed. Use it for early specification, then freeze the final manufacturing schedule only after the configuration and site interfaces are reviewed.

Evidence-controlled technical pageUnconfirmed wind, alloy, motor, warranty and disputed profile-thickness claims are intentionally withheld until current production evidence is received.

Quick reference

Current APERTA planning data.

These are the details Apollo can currently use for first-stage project coordination.
SystemMotorised retractable aluminium-blade roof
ConfigurationsStandalone / freestanding · wall-mounted · roof-only
Promoted standard sizes3 × 3 · 4 × 3 · 4 × 4 · 5 × 3 · 5 × 4 · 6 × 3 · 6 × 4 m
Made to measureAvailable subject to factory module + support review
Retracted louvre stackApprox. 30% of roof depth
Standard coloursBlack · White · mixed Black / White combinations
Mixed-colour exampleBlack frame + White louvres
Freestanding post reference150 × 150 × 2.0 mm aluminium
Retractable blade reference181 × 40 × 1.2 mm aluminium
Roof control220 V motor + receiver + remote
LightingWarm-white perimeter LED included
DrainageIntegrated gutter / drainage pathway
Supply pathwayApollo supply only
CADARN APERTA Black frame with White retractable louvres
Standard mixed-colour pathwayBlack frame + White louvres is a standard mixed Black / White combination.

Roof behaviour

The roof retracts rather than simply rotating in place.

When fully retracted, the louvre pack occupies approximately 30% of the roof depth at one end.
CADARN APERTA closed, partially retracted and fully retracted roof operation
Closed → partial → open skyApprox. 30% of roof depth remains occupied by the stacked louvres at full retraction.

Configuration logic

Three support conditions. Three different project checks.

Standalone / freestanding

Confirm nominal or made-to-measure footprint, finished height, post positions, slab / footing or deck-support condition, anchor zones, drainage discharge and power route. Final post count depends on the selected size and current factory support rule.

Wall-mounted

Confirm the structural wall / framing zone, fixing height, cladding and cavity interfaces, front-support arrangement, flashing / weatherproofing pathway and local structural design.

Roof-only

Confirm the existing supporting frame is accurately measured, level, square and structurally suitable. Record clear opening, support spacing, member sizes, fixing faces and the load-transfer pathway before manufacture.

Power + controls

The confirmed pathway includes a 220 V motor, receiver and remote plus warm-white perimeter LED. Final cable route, isolation and electrical connection remain local project works unless expressly included.

Drainage

Closed-roof water is managed through the integrated roof and gutter pathway. The site team still needs to coordinate the final discharge route and any building-envelope interface.

Made to measure

Custom dimensions are available as a project option. Final production dimensions must remain within the current retractable module, support and factory limits.

Before final specification

Supplier evidence still being closed.

These are not missing project questions; they are the specific production details Apollo is waiting to reconfirm before publishing hard technical claims.
01

Final beam and gutter wall thickness after supplier discrepancy is resolved

Hold as evidence-controlled until the current supplier response / production document is received.

02

Current aluminium alloy / temper confirmation

Hold as evidence-controlled until the current supplier response / production document is received.

03

Motor brand, IP rating and control package

Hold as evidence-controlled until the current supplier response / production document is received.

04

Powder-coat specification and current warranty schedule

Hold as evidence-controlled until the current supplier response / production document is received.

05

Wind / structural load evidence and any applicable test reports

Hold as evidence-controlled until the current supplier response / production document is received.

06

Minimum / maximum made-to-measure dimensions and exact module increment rule

Hold as evidence-controlled until the current supplier response / production document is received.

07

Final wall-mounted post / support arrangement

Hold as evidence-controlled until the current supplier response / production document is received.

08

Final roof-only fixing interface and support requirements

Hold as evidence-controlled until the current supplier response / production document is received.

APERTA system supply

What the product package can include.

  • Configured aluminium frame / support components for the selected pathway
  • Retractable aluminium louvre roof components
  • Motor, receiver and remote-control pathway
  • Warm-white perimeter LED lighting
  • Integrated gutter / drainage components
  • Specified hardware and ordered accessories
  • Track-guided screens, sensing or RGB options where confirmed and ordered
  • Current supplied documentation for the final configuration

Local / project works

What normally remains with the site team.

  • Foundations, slabs and structural strengthening
  • On-site assembly and safe access
  • Wall framing / support structure where applicable
  • Electrical supply and final connection
  • Final drainage connection / discharge
  • Building-envelope flashing and sealing
  • Local engineering, approvals and consenting
  • Unloading, lifting and site handling unless expressly quoted

Next step

Choose the configuration, then send the result for quote review.

Project