Buildings & Large Structures · Request for proposal
Send the building requirements. Apollo will qualify the supply route.
Use this pathway for a sports hall, church, school, community building, warehouse, commercial or industrial facility, hangar, agricultural building or custom large-span structure. Apollo starts from the RFP and works outward to the appropriate manufacturer.
Review building applicationsBuildings & Large Structures · Project RFP
Give the factory the right problem to solve.
You do not need completed engineering to start. Approximate geometry, intended use, destination and known design criteria are enough for Apollo to begin the manufacturer review.
What Apollo needs firstBuilding use, country and approximate length × width × height.Required clear span, major openings and enclosure type.Known wind, cyclone, seismic, corrosion, fire or code criteria.Drawings, BOQ or specifications where available.Local contractor / installation pathway if already known.
