Skip to main content
Apollo NZ GlobalStart Exact Project Brief

APOLLO · PROJECT SUBMITTAL REGISTER

Give every certificate, drawing, manual and project file a visible status.

Use this working register while supplier and project evidence is being collected. It combines evidence gates, drawing/CAD/BIM requirements and O&M/handover deliverables for the selected Authority Programme and exports the current schedule as CSV.

Required: 22Requested: 0Received: 0Reviewed: 0Accepted: 0Not applicable: 0
IDCategoryRequired submittal / deliverableRelease basisStatus
E-01Evidence / qualificationExact building/system technical datasheets and material schedulesExact system / project
E-02Evidence / qualificationStructural/fire/public-health evidence applicable to the selected systemExact system / project
E-03Evidence / qualificationWater, sanitation and treatment evidence tied to the exact equipmentExact system / project
E-04Evidence / qualificationPower/generator certification and exact component documentationExact system / project
E-05Evidence / qualificationFactory QA, inspection, packing and traceability planExact system / project
E-06Evidence / qualificationWarranty, manuals, critical spares and operator training scopeExact system / project
E-07Evidence / qualificationDonor/agency/local statutory requirements recorded separately from product evidenceExact system / project
D-01Drawing / CAD / BIMProgramme / community concept / planning layoutPublic planning
D-02Drawing / CAD / BIMGeneric technical reference / typical detailPublic planning
D-03Drawing / CAD / BIMExact-system GA / dimensional drawingExact-system
D-04Drawing / CAD / BIMNative CAD / DWG / DXFVerify availability
D-05Drawing / CAD / BIMBIM / Revit / IFC objectVerify availability
D-06Drawing / CAD / BIMFoundation / fixing / setting-out drawingProject-specific
D-07Drawing / CAD / BIMServices / electrical / controls interfaceProject-specific
O-01O&M / handoverAsset register by building/systemHandover / operations
O-02O&M / handoverRoutine WASH and water-system inspectionHandover / operations
O-03O&M / handoverGenerator/power maintenance scheduleHandover / operations
O-04O&M / handoverConsumables and critical spare-parts registerHandover / operations
O-05O&M / handoverCleaning, hygiene and public-health routinesHandover / operations
O-06O&M / handoverDefect logging and warranty escalationHandover / operations
O-07O&M / handoverOperator manuals / competency recordsHandover / operations
O-08O&M / handoverPeriodic review against changing programme demandHandover / operations
Status is a project-workflow aid, not a certification claim. “Accepted” means accepted by the responsible project review process for the exact item; it does not create a new product approval or override destination requirements.

WHEN FILES ARRIVE

Use the register with the evidence/CAD matrix and exact specification pack.

Open RHELGAN Specification Pack
Project