TREVIK · SPECIFICATION STARTER
Architectural Opening Systems
Use this as a controlled starting point for consultant coordination, tender preparation and project review. Replace planning language with exact project/system information before procurement.
APOLLO NZ GLOBAL · WHOLESALE & PROJECT SUPPLY
TREVIK
Architectural Opening Systems
- Project
- ________________
- Destination
- ________________
- Status
- Concept / tender starter
- Review
- 05 Oct 2026
PROJECT INTENT / TECHNICAL INPUTS
- Opening width/height and surrounding construction
- Internal/external, exposure and wind criteria
- Transparency, security, ventilation and weather objective
- Operation frequency and manual/motorised control
- Threshold, drainage and floor-level interfaces
- Fire/egress/accessibility requirements where relevant
- Power, controls, sensors and emergency operation
- Finish, corrosion class, fixing substrate and installation responsibility
PERFORMANCE / SPECIFICATION CLAUSES
- Opening and surrounding construction
- System type / operation
- Weather/wind/security performance
- Glazing/panel/material configuration
- Threshold/drainage
- Motor/control/safety logic
- Access/egress/fire interfaces
- Finish/corrosion
- Fixing/installation/submittals
REQUIRED EVIDENCE / SUBMITTALS
- Exact-system dimensional/section data
- Wind/air/water performance evidence where claimed
- Glass/polycarbonate/material safety evidence
- Motor/control/safety-device documentation
- Fire/egress evidence only where exact product is approved for that use
- Coating/corrosion evidence
- Fixing/structural requirements and warranty
DRAWING / CAD / BIM REGISTER
- Opening concept / planning layout — Public planning: Early scope, interface and consultant coordination only.
- Generic technical reference / typical detail — Public planning: Explains system logic without representing an exact supplied configuration.
- Exact-system GA / dimensional drawing — Exact-system: Issued only after the quoted system/configuration is known.
- Native CAD / DWG / DXF — Verify availability: Availability and revision must be confirmed against the exact supplied system.
- BIM / Revit / IFC object — Verify availability: Only described as BIM where a genuine verified native model exists.
- Foundation / fixing / setting-out drawing — Project-specific: Depends on site/building conditions, local engineering and the selected system.
- Services / electrical / controls interface — Project-specific: Coordinates the supplied system with local power, data, water, drainage or controls.
TENDER / BIDDER RETURN SCHEDULE
- Opening schedule
- Elevations/sections
- Exposure/wind criteria
- Operation/security requirements
- Threshold/drainage
- Controls/power
- Finish
- Local code/access/fire interfaces
- Drawing/evidence schedule
OPERATIONS / MAINTENANCE / HANDOVER
- Track/roller/hinge inspection
- Motor/control/sensor test
- Emergency/manual operation test
- Seal/weatherstrip inspection
- Drainage/threshold cleaning
- Glazing/panel inspection
- Coating/corrosion check
- Spare hardware/control register
Supply boundary
Apollo NZ Global is Wholesale & Project Supply and supply-only. Local professional design, engineering, civil works, electrical work, installation, statutory approvals, commissioning and operational responsibilities remain with the appointed project parties unless expressly included in writing.
Use: planning/specification starter only. Exact selected-system evidence, current drawings and destination requirements take precedence.
NEXT STEP
