Use this as a controlled starting point for consultant coordination, tender preparation and project review. Replace planning language with exact project/system information before procurement.
APOLLO NZ GLOBAL · WHOLESALE & PROJECT SUPPLY
EMBR + CAOR
Corten Fire & Traditional Outdoor Oven Systems
- Project
- ________________
- Destination
- ________________
- Status
- Concept / tender starter
- Review
- 05 Oct 2026
PROJECT INTENT / TECHNICAL INPUTS
- Fireplace/oven/table type and intended use
- Outdoor/semi-outdoor/enclosed context
- Combustible clearances and adjacent materials
- Hearth/base/foundation/support
- Flue/chimney/termination where applicable
- Weather exposure, drainage and weathering-steel wet/dry cycling
- Coastal/chloride proximity and corrosion risk
- Fuel storage, ash handling and local fire restrictions
PERFORMANCE / SPECIFICATION CLAUSES
- System type/use
- Material/firebox construction
- Clearances/hearth/base
- Flue/chimney if applicable
- Drainage/weather exposure
- Weathering-steel care/coastal limitations
- Fuel/ash operating requirements
- Local fire/code interfaces
- Maintenance/warranty
REQUIRED EVIDENCE / SUBMITTALS
- Exact material/thickness construction
- Firebox/oven dimensional data
- Flue/chimney component documentation where supplied
- Heat shielding / clearances from exact-system documentation
- Finish/weathering-steel care instructions
- Local compliance responsibilities stated separately
- Warranty and replacement component availability
DRAWING / CAD / BIM REGISTER
- Live-fire concept / planning layout — Public planning: Early scope, interface and consultant coordination only.
- Generic technical reference / typical detail — Public planning: Explains system logic without representing an exact supplied configuration.
- Exact-system GA / dimensional drawing — Exact-system: Issued only after the quoted system/configuration is known.
- Native CAD / DWG / DXF — Verify availability: Availability and revision must be confirmed against the exact supplied system.
- BIM / Revit / IFC object — Verify availability: Only described as BIM where a genuine verified native model exists.
- Foundation / fixing / setting-out drawing — Project-specific: Depends on site/building conditions, local engineering and the selected system.
- Services / electrical / controls interface — Project-specific: Coordinates the supplied system with local power, data, water, drainage or controls.
TENDER / BIDDER RETURN SCHEDULE
- System schedule
- Site plan/context
- Adjacent materials
- Base/hearth
- Flue requirement
- Exposure/coastal distance
- Local fire rules
- Fuel/operation
- Evidence/maintenance
OPERATIONS / MAINTENANCE / HANDOVER
- Ash removal
- Firebox/oven cleaning
- Flue/chimney inspection where applicable
- Drainage check
- Weathering-steel wet/dry maintenance
- Coastal corrosion inspection
- Door/hinge/damper maintenance
- Fuel storage/fire-safety procedure
Supply boundary
Apollo NZ Global is Wholesale & Project Supply and supply-only. Local professional design, engineering, civil works, electrical work, installation, statutory approvals, commissioning and operational responsibilities remain with the appointed project parties unless expressly included in writing.
Use: planning/specification starter only. Exact selected-system evidence, current drawings and destination requirements take precedence.