EMBR + CAOR · SPECIFICATION STARTER

Corten Fire & Traditional Outdoor Oven Systems

Use this as a controlled starting point for consultant coordination, tender preparation and project review. Replace planning language with exact project/system information before procurement.

APOLLO NZ GLOBAL · WHOLESALE & PROJECT SUPPLY

EMBR + CAOR

Corten Fire & Traditional Outdoor Oven Systems

Project
________________
Destination
________________
Status
Concept / tender starter
Review
05 Oct 2026
01

PROJECT INTENT / TECHNICAL INPUTS

  1. Fireplace/oven/table type and intended use
  2. Outdoor/semi-outdoor/enclosed context
  3. Combustible clearances and adjacent materials
  4. Hearth/base/foundation/support
  5. Flue/chimney/termination where applicable
  6. Weather exposure, drainage and weathering-steel wet/dry cycling
  7. Coastal/chloride proximity and corrosion risk
  8. Fuel storage, ash handling and local fire restrictions
02

PERFORMANCE / SPECIFICATION CLAUSES

  1. System type/use
  2. Material/firebox construction
  3. Clearances/hearth/base
  4. Flue/chimney if applicable
  5. Drainage/weather exposure
  6. Weathering-steel care/coastal limitations
  7. Fuel/ash operating requirements
  8. Local fire/code interfaces
  9. Maintenance/warranty
03

REQUIRED EVIDENCE / SUBMITTALS

  1. Exact material/thickness construction
  2. Firebox/oven dimensional data
  3. Flue/chimney component documentation where supplied
  4. Heat shielding / clearances from exact-system documentation
  5. Finish/weathering-steel care instructions
  6. Local compliance responsibilities stated separately
  7. Warranty and replacement component availability
04

DRAWING / CAD / BIM REGISTER

  1. Live-fire concept / planning layout — Public planning: Early scope, interface and consultant coordination only.
  2. Generic technical reference / typical detail — Public planning: Explains system logic without representing an exact supplied configuration.
  3. Exact-system GA / dimensional drawing — Exact-system: Issued only after the quoted system/configuration is known.
  4. Native CAD / DWG / DXF — Verify availability: Availability and revision must be confirmed against the exact supplied system.
  5. BIM / Revit / IFC object — Verify availability: Only described as BIM where a genuine verified native model exists.
  6. Foundation / fixing / setting-out drawing — Project-specific: Depends on site/building conditions, local engineering and the selected system.
  7. Services / electrical / controls interface — Project-specific: Coordinates the supplied system with local power, data, water, drainage or controls.
05

TENDER / BIDDER RETURN SCHEDULE

  1. System schedule
  2. Site plan/context
  3. Adjacent materials
  4. Base/hearth
  5. Flue requirement
  6. Exposure/coastal distance
  7. Local fire rules
  8. Fuel/operation
  9. Evidence/maintenance
06

OPERATIONS / MAINTENANCE / HANDOVER

  1. Ash removal
  2. Firebox/oven cleaning
  3. Flue/chimney inspection where applicable
  4. Drainage check
  5. Weathering-steel wet/dry maintenance
  6. Coastal corrosion inspection
  7. Door/hinge/damper maintenance
  8. Fuel storage/fire-safety procedure

Supply boundary

Apollo NZ Global is Wholesale & Project Supply and supply-only. Local professional design, engineering, civil works, electrical work, installation, statutory approvals, commissioning and operational responsibilities remain with the appointed project parties unless expressly included in writing.

Use: planning/specification starter only. Exact selected-system evidence, current drawings and destination requirements take precedence.

NEXT STEP

Check actual document availability before issuing the pack as an exact product requirement.

Evidence / CAD Matrix
Project