Skip to main content
Apollo NZ GlobalStart Exact Project Brief

FASGAR · SPECIFICATION STARTER

Architectural Roof Systems

Use this as a controlled starting point for consultant coordination, tender preparation and project review. Replace planning language with exact project/system information before procurement.

APOLLO NZ GLOBAL · WHOLESALE & PROJECT SUPPLY

FASGAR

Architectural Roof Systems

Project
________________
Destination
________________
Status
Concept / tender starter
Review
05 Oct 2026
01

PROJECT INTENT / TECHNICAL INPUTS

  1. Fixed or retractable roof pathway
  2. Overall dimensions, bay layout and support condition
  3. Wall-mounted/freestanding/existing-structure interface
  4. Rainwater collection, falls, gutters and discharge route
  5. Wind, snow where relevant and coastal/environment exposure
  6. Membrane/material/roof-panel requirements
  7. Motor, control, sensor and power requirements for retractable systems
  8. Foundation/fixing, freight, installation and local engineering responsibility
02

PERFORMANCE / SPECIFICATION CLAUSES

  1. Roof pathway and geometry
  2. Primary frame and roof/membrane material
  3. Structural design criteria
  4. Drainage/rainwater management
  5. Movement and operating state
  6. Motor/controls/electrical interface
  7. Finish/coastal exposure
  8. Foundation/fixing responsibilities
  9. Evidence, drawings and maintenance
03

REQUIRED EVIDENCE / SUBMITTALS

  1. Exact aluminium/profile/material specification
  2. Exact membrane construction and fire evidence where applicable
  3. Structural/span/wind evidence for selected configuration
  4. Motor/control/sensor documentation
  5. Drainage/gutter/downpipe details
  6. Coating/corrosion suitability
  7. Exact-system drawings, installation information and warranty
04

DRAWING / CAD / BIM REGISTER

  1. Architectural roof concept / planning layout — Public planning: Early scope, interface and consultant coordination only.
  2. Generic technical reference / typical detail — Public planning: Explains system logic without representing an exact supplied configuration.
  3. Exact-system GA / dimensional drawing — Exact-system: Issued only after the quoted system/configuration is known.
  4. Native CAD / DWG / DXF — Verify availability: Availability and revision must be confirmed against the exact supplied system.
  5. BIM / Revit / IFC object — Verify availability: Only described as BIM where a genuine verified native model exists.
  6. Foundation / fixing / setting-out drawing — Project-specific: Depends on site/building conditions, local engineering and the selected system.
  7. Services / electrical / controls interface — Project-specific: Coordinates the supplied system with local power, data, water, drainage or controls.
05

TENDER / BIDDER RETURN SCHEDULE

  1. Site/roof plan
  2. Dimensions/bay layout
  3. Fixed/retractable intent
  4. Wind/snow/environment
  5. Drainage route
  6. Material/membrane requirement
  7. Power/controls
  8. Fixing/foundation interface
  9. Evidence/drawings
  10. Freight/installation scope
06

OPERATIONS / MAINTENANCE / HANDOVER

  1. Roof/membrane cleaning
  2. Drainage/gutter inspection
  3. Motor/control service
  4. Track/moving-component inspection
  5. Fastener/connection check
  6. Coating/corrosion review
  7. Storm/high-wind operating procedure
  8. Replacement membrane/control/spare plan

Supply boundary

Apollo NZ Global is Wholesale & Project Supply and supply-only. Local professional design, engineering, civil works, electrical work, installation, statutory approvals, commissioning and operational responsibilities remain with the appointed project parties unless expressly included in writing.

Use: planning/specification starter only. Exact selected-system evidence, current drawings and destination requirements take precedence.

NEXT STEP

Check actual document availability before issuing the pack as an exact product requirement.

Evidence / CAD Matrix
Project