FASGAR · SPECIFICATION STARTER
Architectural Roof Systems
Use this as a controlled starting point for consultant coordination, tender preparation and project review. Replace planning language with exact project/system information before procurement.
APOLLO NZ GLOBAL · WHOLESALE & PROJECT SUPPLY
FASGAR
Architectural Roof Systems
- Project
- ________________
- Destination
- ________________
- Status
- Concept / tender starter
- Review
- 05 Oct 2026
PROJECT INTENT / TECHNICAL INPUTS
- Fixed or retractable roof pathway
- Overall dimensions, bay layout and support condition
- Wall-mounted/freestanding/existing-structure interface
- Rainwater collection, falls, gutters and discharge route
- Wind, snow where relevant and coastal/environment exposure
- Membrane/material/roof-panel requirements
- Motor, control, sensor and power requirements for retractable systems
- Foundation/fixing, freight, installation and local engineering responsibility
PERFORMANCE / SPECIFICATION CLAUSES
- Roof pathway and geometry
- Primary frame and roof/membrane material
- Structural design criteria
- Drainage/rainwater management
- Movement and operating state
- Motor/controls/electrical interface
- Finish/coastal exposure
- Foundation/fixing responsibilities
- Evidence, drawings and maintenance
REQUIRED EVIDENCE / SUBMITTALS
- Exact aluminium/profile/material specification
- Exact membrane construction and fire evidence where applicable
- Structural/span/wind evidence for selected configuration
- Motor/control/sensor documentation
- Drainage/gutter/downpipe details
- Coating/corrosion suitability
- Exact-system drawings, installation information and warranty
DRAWING / CAD / BIM REGISTER
- Architectural roof concept / planning layout — Public planning: Early scope, interface and consultant coordination only.
- Generic technical reference / typical detail — Public planning: Explains system logic without representing an exact supplied configuration.
- Exact-system GA / dimensional drawing — Exact-system: Issued only after the quoted system/configuration is known.
- Native CAD / DWG / DXF — Verify availability: Availability and revision must be confirmed against the exact supplied system.
- BIM / Revit / IFC object — Verify availability: Only described as BIM where a genuine verified native model exists.
- Foundation / fixing / setting-out drawing — Project-specific: Depends on site/building conditions, local engineering and the selected system.
- Services / electrical / controls interface — Project-specific: Coordinates the supplied system with local power, data, water, drainage or controls.
TENDER / BIDDER RETURN SCHEDULE
- Site/roof plan
- Dimensions/bay layout
- Fixed/retractable intent
- Wind/snow/environment
- Drainage route
- Material/membrane requirement
- Power/controls
- Fixing/foundation interface
- Evidence/drawings
- Freight/installation scope
OPERATIONS / MAINTENANCE / HANDOVER
- Roof/membrane cleaning
- Drainage/gutter inspection
- Motor/control service
- Track/moving-component inspection
- Fastener/connection check
- Coating/corrosion review
- Storm/high-wind operating procedure
- Replacement membrane/control/spare plan
Supply boundary
Apollo NZ Global is Wholesale & Project Supply and supply-only. Local professional design, engineering, civil works, electrical work, installation, statutory approvals, commissioning and operational responsibilities remain with the appointed project parties unless expressly included in writing.
Use: planning/specification starter only. Exact selected-system evidence, current drawings and destination requirements take precedence.
NEXT STEP
