Skip to main content
Apollo NZ GlobalStart Exact Project Brief

CENYRA · SPECIFICATION STARTER

Automated Retail & Self-Service Systems

Use this as a controlled starting point for consultant coordination, tender preparation and project review. Replace planning language with exact project/system information before procurement.

APOLLO NZ GLOBAL · WHOLESALE & PROJECT SUPPLY

CENYRA

Automated Retail & Self-Service Systems

Project
________________
Destination
________________
Status
Concept / tender starter
Review
05 Oct 2026
01

PROJECT INTENT / TECHNICAL INPUTS

  1. Use case and product/service dispensed
  2. Indoor/outdoor/industrial/remote environment
  3. Ambient, chilled, frozen, heated or mixed-temperature requirement
  4. Power, water, drainage, ventilation and other site services
  5. Payment, credential, RFID, QR/app or free-access model
  6. Telemetry, API/MDB/SDK/backend and operator data requirements
  7. Security, vandal exposure, CCTV/lighting context and anchoring
  8. Stocking/refill, waste, hygiene, local servicing and fleet size
02

PERFORMANCE / SPECIFICATION CLAUSES

  1. Service outcome and operator model
  2. Machine family and capacity/performance
  3. Temperature and product-contact requirements
  4. Power/water/drainage/ventilation interfaces
  5. Payment/access and user journey
  6. Telemetry/backend/data ownership
  7. Security and public-use requirements
  8. Refill/service/cleaning access
  9. Evidence, warranty, spares and lifecycle
03

REQUIRED EVIDENCE / SUBMITTALS

  1. Exact-machine electrical/safety certification for destination
  2. Food-contact / potable-water / hygiene evidence where applicable
  3. Refrigeration/heating performance and operating-temperature range
  4. Payment/access hardware and backend compatibility evidence
  5. Telemetry/API/MDB/SDK documentation where integration is required
  6. IP/IK/weather/corrosion evidence for outdoor or industrial use
  7. Warranty, spare modules, consumables and service documentation
04

DRAWING / CAD / BIM REGISTER

  1. Self-service site concept / planning layout — Public planning: Early scope, interface and consultant coordination only.
  2. Generic technical reference / typical detail — Public planning: Explains system logic without representing an exact supplied configuration.
  3. Exact-system GA / dimensional drawing — Exact-system: Issued only after the quoted system/configuration is known.
  4. Native CAD / DWG / DXF — Verify availability: Availability and revision must be confirmed against the exact supplied system.
  5. BIM / Revit / IFC object — Verify availability: Only described as BIM where a genuine verified native model exists.
  6. Foundation / fixing / setting-out drawing — Project-specific: Depends on site/building conditions, local engineering and the selected system.
  7. Services / electrical / controls interface — Project-specific: Coordinates the supplied system with local power, data, water, drainage or controls.
05

TENDER / BIDDER RETURN SCHEDULE

  1. Use-case schedule
  2. Site/environment schedule
  3. Utility connection schedule
  4. Payment/access specification
  5. Telemetry/integration requirements
  6. Hygiene/security requirements
  7. Exact machine qualification evidence
  8. Installation/anchoring/interface drawings
  9. Operator service and spare-parts requirements
06

OPERATIONS / MAINTENANCE / HANDOVER

  1. Daily/shift machine condition check
  2. Cleaning and hygiene schedule
  3. Stock/refill and cold-chain control where relevant
  4. Payment/access fault reconciliation
  5. Telemetry/fleet alarms and escalation
  6. Filters, refrigeration/heating and moving-component maintenance
  7. Critical spare modules / consumables
  8. Security/vandalism incident log

Supply boundary

Apollo NZ Global is Wholesale & Project Supply and supply-only. Local professional design, engineering, civil works, electrical work, installation, statutory approvals, commissioning and operational responsibilities remain with the appointed project parties unless expressly included in writing.

Use: planning/specification starter only. Exact selected-system evidence, current drawings and destination requirements take precedence.

NEXT STEP

Check actual document availability before issuing the pack as an exact product requirement.

Evidence / CAD Matrix
Project