Skip to main content
Apollo NZ GlobalStart Exact Project Brief

AETREN · SPECIFICATION STARTER

Charging Infrastructure Systems

Use this as a controlled starting point for consultant coordination, tender preparation and project review. Replace planning language with exact project/system information before procurement.

APOLLO NZ GLOBAL · WHOLESALE & PROJECT SUPPLY

AETREN

Charging Infrastructure Systems

Project
________________
Destination
________________
Status
Concept / tender starter
Review
05 Oct 2026
01

PROJECT INTENT / TECHNICAL INPUTS

  1. Destination country and local electrical standard
  2. Site type, vehicle mix, fleet/public use and parking dwell time
  3. Daily energy requirement and simultaneous charging assumptions
  4. Available electrical capacity, transformer/switchboard context and future growth
  5. AC/DC charger mix, connector standard and cable-management strategy
  6. Load balancing / dynamic load management / energy-management requirement
  7. OCPP/backend, payment, RFID, app and data/network ownership
  8. Civil works, bollards, signage, accessibility, weather exposure and service access
02

PERFORMANCE / SPECIFICATION CLAUSES

  1. Charging use case and service level
  2. AC/DC power architecture
  3. Vehicle/connector compatibility
  4. Electrical capacity and diversity assumptions
  5. Dynamic load management / site controls
  6. Backend/OCPP/payment/network requirements
  7. Environmental and impact protection
  8. Civil/foundation/cable-routing interfaces
  9. Evidence, commissioning, warranty and service requirements
03

REQUIRED EVIDENCE / SUBMITTALS

  1. Exact-model destination electrical/safety certification
  2. OCPP version and independent interoperability evidence where claimed
  3. Metering / payment compliance where relevant
  4. IP/IK, temperature, humidity and environmental performance
  5. Load-management architecture and supported communication protocols
  6. Warranty, spare modules, service tooling and firmware/update pathway
  7. Exact connector/cable evidence and destination compatibility
04

DRAWING / CAD / BIM REGISTER

  1. Charging-site concept / planning layout — Public planning: Early scope, interface and consultant coordination only.
  2. Generic technical reference / typical detail — Public planning: Explains system logic without representing an exact supplied configuration.
  3. Exact-system GA / dimensional drawing — Exact-system: Issued only after the quoted system/configuration is known.
  4. Native CAD / DWG / DXF — Verify availability: Availability and revision must be confirmed against the exact supplied system.
  5. BIM / Revit / IFC object — Verify availability: Only described as BIM where a genuine verified native model exists.
  6. Foundation / fixing / setting-out drawing — Project-specific: Depends on site/building conditions, local engineering and the selected system.
  7. Services / electrical / controls interface — Project-specific: Coordinates the supplied system with local power, data, water, drainage or controls.
05

TENDER / BIDDER RETURN SCHEDULE

  1. Site single-line / electrical information
  2. Parking and charger layout
  3. Vehicle/use profile
  4. Charger power and quantity schedule
  5. Backend/payment/network specification
  6. Load-management requirement
  7. Environmental/impact requirements
  8. Certification/document schedule
  9. Commissioning/service/warranty scope
06

OPERATIONS / MAINTENANCE / HANDOVER

  1. Charger availability and fault log
  2. Cable/connector inspection
  3. Enclosure and impact-protection inspection
  4. Backend/OCPP connectivity monitoring
  5. Meter/payment reconciliation where applicable
  6. Firmware and cybersecurity/update control
  7. Critical spare modules and service response
  8. Periodic capacity review as fleet/usage grows

Supply boundary

Apollo NZ Global is Wholesale & Project Supply and supply-only. Local professional design, engineering, civil works, electrical work, installation, statutory approvals, commissioning and operational responsibilities remain with the appointed project parties unless expressly included in writing.

Programme note: NZ remains excluded from the AETREN public product pathway until exact products and certification are approved.

Use: planning/specification starter only. Exact selected-system evidence, current drawings and destination requirements take precedence.

NEXT STEP

Check actual document availability before issuing the pack as an exact product requirement.

Evidence / CAD Matrix
Project