APOLLO · PROJECT / TENDER PACK BUILDER
Turn the authority framework into a project-ready return schedule.
Select the product family and project context to generate a structured pack covering inputs, evidence, drawing status, specification clauses, tender returns and handover. It is a starting project-control document, not a final professional specification.
PROJECT INPUTS
Choose the authority programme and context.
RHELGAN
RHELGAN — PROJECT / TENDER AUTHORITY PACK Development & Humanitarian Systems Reference review: 4 October 2026 PROJECT Name: [Project name] Destination: [Country / city] Stage: Tender / RFP 1. PROJECT / TECHNICAL INPUTS - Country, programme owner and procurement/funding pathway - Population, household count or facility user demand - Housing / WASH / water / health / education / community building mix - Climate, hazards, site access and logistics constraints - Water source, wastewater pathway and daily demand assumptions - Power source, critical loads, backup strategy and electrical standard - Accessibility, safeguarding, public-health and local code requirements - Manufacturing phasing, freight, storage, installation and handover responsibilities 2. EVIDENCE GATES - Exact building/system technical datasheets and material schedules - Structural/fire/public-health evidence applicable to the selected system - Water, sanitation and treatment evidence tied to the exact equipment - Power/generator certification and exact component documentation - Factory QA, inspection, packing and traceability plan - Warranty, manuals, critical spares and operator training scope - Donor/agency/local statutory requirements recorded separately from product evidence 3. DRAWING / CAD / BIM REGISTER - Programme / community concept / planning layout [Public planning]: Early scope, interface and consultant coordination only. - Generic technical reference / typical detail [Public planning]: Explains system logic without representing an exact supplied configuration. - Exact-system GA / dimensional drawing [Exact-system]: Issued only after the quoted system/configuration is known. - Native CAD / DWG / DXF [Verify availability]: Availability and revision must be confirmed against the exact supplied system. - BIM / Revit / IFC object [Verify availability]: Only described as BIM where a genuine verified native model exists. - Foundation / fixing / setting-out drawing [Project-specific]: Depends on site/building conditions, local engineering and the selected system. - Services / electrical / controls interface [Project-specific]: Coordinates the supplied system with local power, data, water, drainage or controls. 4. SPECIFICATION CLAUSES - Programme outcomes and design population - Building and infrastructure performance criteria - Climate/resilience and hazard requirements - Water/WASH demand and service interfaces - Power and backup-power architecture - Accessibility and safeguarding interfaces - Documentation, QA and inspection requirements - Packing, freight, site receiving and phased rollout - Installation / commissioning / operator responsibility matrix 5. TENDER / RFP RETURN SCHEDULE - Programme brief and destination - Site/masterplan information - Required buildings/infrastructure quantities - Performance and evidence requirements - Utility/service assumptions - Required drawings/submittals - Manufacturing/inspection programme - Packing and logistics strategy - Warranty, spares, manuals and training 6. OPERATIONS / HANDOVER - Asset register by building/system - Routine WASH and water-system inspection - Generator/power maintenance schedule - Consumables and critical spare-parts register - Cleaning, hygiene and public-health routines - Defect logging and warranty escalation - Operator manuals / competency records - Periodic review against changing programme demand 7. PROJECT NOTES [Add project-specific notes, programme, constraints, interfaces or exclusions.] 8. SUPPLY BOUNDARY Apollo NZ Global is Wholesale & Project Supply and supply-only. Local professional design, engineering, civil works, electrical work, installation, statutory approvals, commissioning and operational responsibilities remain with the appointed project parties unless expressly included in writing.
Evidence Tracker
Track missing, requested, received and verified evidence for the selected family.
Open trackerCAD / Drawing Library
See which resources are public planning, exact-system, project-specific or availability-to-verify.
Open drawing registerRHELGAN Authority Centre
Return to the full product-family authority workflow and connected technical resources.
Open centreNEXT STEP
