Architectural Louvre Specification Schedule
Project briefing and evidence-request worksheet · Revision 01 · 2 November 2026
Planning document — not an engineering specification. Reference dimensions or material descriptions do not establish safe allowable spans, compliance or site suitability. Apollo supplies systems only; local qualified parties remain responsible for engineering, foundations, installation and approvals.
01 · Project definition
Project / organisationTo confirm / attach evidence
Location / countryTo confirm / attach evidence
Project use and occupancyTo confirm / attach evidence
Target programmeTo confirm / attach evidence
Consultant / contractor contactsTo confirm / attach evidence
02 · Architectural geometry
Width × projection × intended clear heightTo confirm / attach evidence
Bay number and layoutTo confirm / attach evidence
Freestanding / attached / inset interfaceTo confirm / attach evidence
Site photographs and architectural plansTo confirm / attach evidence
Setbacks, obstacles, adjacent structures and accessTo confirm / attach evidence
03 · Roof performance
ROTATE / SPAN / STORM / OPEN / INSETTo confirm / attach evidence
Rotating versus retracting behaviourTo confirm / attach evidence
Local wind, rain, snow and seismic criteriaTo confirm / attach evidence
Required structural reactions and supportsTo confirm / attach evidence
Water collection, outlets and dischargeTo confirm / attach evidence
04 · Integrated systems
Motor power and destination electrical complianceTo confirm / attach evidence
Controls, zoning, remote / applicationTo confirm / attach evidence
Rain and wind sensingTo confirm / attach evidence
Lighting and driversTo confirm / attach evidence
Glass, screens and threshold interfacesTo confirm / attach evidence
05 · Commercial release checks
Supplier-confirmed exact model and profile scheduleTo confirm / attach evidence
Verified drawings and relevant performance evidenceTo confirm / attach evidence
Final finishes and exposure treatmentTo confirm / attach evidence
Order-specific bill of materials and packingTo confirm / attach evidence
Warranty, maintenance, assembly and commissioning documentsTo confirm / attach evidence