There is no useful single global price for a 3x3 court. The cost changes far more with base condition, playing level, equipment approval, lighting and venue infrastructure than with the painted rectangle alone.
PLANNING REFERENCE
This page answers one narrow planning question. Use the Technical Centre and Project Brief for the complete 3x3 system.
New concrete or asphalt, drainage, crack repair, level correction and foundations can outweigh the playing-surface cost on a difficult site.
A community backstop and simple lighting brief are very different from a current Level 1 approved competition package with 12-second timing, event technology and controlled spectator zones.
Portable systems shift cost into cases, handling, transport, storage, temporary power, crew time and repeated setup rather than eliminating infrastructure.
Country, port/depot route, packing volume, installation responsibilities and local engineering all affect the delivered project basis.
PROJECT CHECK
Define the playing level before requesting price
Confirm whether the base already exists
Separate supply from local construction
List lighting, fencing, seating and technology scope
Identify destination and target delivery date