Skip to main content
Apollo NZ GlobalStart Project Brief
TORVYR — Strength & Training SystemsTORVYR COMPLETE

TORVYR COMPLETE · SCHOOL / UNIVERSITY GYM

Shared-use training facilities planned around supervision and durability.

TORVYR School & University Gym combines general strength, racks, functional training, conditioning and robust storage for facilities serving multiple groups. Equipment choice should reflect supervision, user experience, programme progression and staged procurement.

SchoolsUniversitiesSports academiesEducation campuses

Facility architecture

Build the training zones before choosing individual machines.

The mix below is a planning framework. Final models and quantities follow the actual floor plan, programme, user capacity and approved product evidence.

01

General strength

Use intuitive, supervision-friendly strength pathways with clear circulation.

  • Selected selectorised strength
  • Cable / multifunction
  • Benches
  • General free weights
Explore system
02

Racks & functional

Create coached stations for team and curriculum use.

  • Power / squat racks
  • Functional rig pathway
  • Loaded training
  • Open movement area
Explore system
03

Conditioning

Coordinate conditioning equipment with class size and supervision.

  • Treadmill pathway
  • Air-bike / rower
  • General cardio
  • Station rotation
Explore system
04

Storage & flooring

Build clear equipment control and robust surfaces for shared users.

  • Shared storage
  • Plate / bar organisation
  • Impact flooring
  • Circulation zones
Explore system

Project inputs

What we need first.

  1. 01Age / user groups
  2. 02Curriculum, team and community use
  3. 03Peak supervised group size
  4. 04Existing hall / gym dimensions
  5. 05Storage and equipment-control needs
  6. 06Procurement stage / expansion plan

TORVYR output

What the project brief produces.

  1. 01Supervision-friendly equipment layout
  2. 02Staged equipment schedule
  3. 03Shared-user storage strategy
  4. 04Surface / impact zoning
  5. 05Clear circulation
  6. 06Model-level technical release before purchase

Smart project brief

Start with the facility, not a shopping list.

Send these project details and Apollo can build the first TORVYR equipment-supply scope without forcing unverified models into the proposal.

School / university / academy typePrimary age groupsPeak class / team sizeRoom area and clear heightSports / programme prioritiesTarget procurement stage

Specification control

Facility page live. Product approval remains separate.

TORVYR Complete pages describe the project pathway and equipment families. Exact dimensions, capacities, loads, construction, warranty, fixing and certification are released only for the selected products once their technical evidence is approved.

TORVYR COMPLETE

Turn the floor plan into an equipment-supply brief.

Start TORVYR Project Brief
Project