Skip to main content
Apollo NZ GlobalStart Project Brief
TORVYR — Strength & Training SystemsTORVYR COMPLETE

TORVYR COMPLETE · FUNCTIONAL / RACE TRAINING

High-flow functional and race-style training built around lanes and station rotation.

TORVYR Functional / Race Training Facility combines rigs, sled and movement lanes, loaded training, conditioning stations, storage and suitable surfaces into a repeatable training environment. It is positioned generically and does not imply affiliation with any third-party fitness race.

Functional fitness gymsRace-style training facilitiesHybrid gymsPerformance training studios

Facility architecture

Build the training zones before choosing individual machines.

The mix below is a planning framework. Final models and quantities follow the actual floor plan, programme, user capacity and approved product evidence.

01

Movement lanes

Plan sled, carry and lunge routes around the floor before filling the room with equipment.

  • Sled lanes
  • Loaded carry routes
  • Transition areas
  • Turf / floor interfaces
Explore system
02

Rig & station zone

Use rigs and stations to create repeatable class rotations and shared work points.

  • Functional rigs
  • Training stations
  • Wall / freestanding options
  • Group-training attachments
Explore system
03

Conditioning stations

Match station count to class format and peak throughput.

  • Rower pathways
  • Air-bike pathways
  • Running / treadmill options
  • Other conditioning
Explore system
04

Loaded equipment & storage

Keep plates, dumbbells, kettlebells, balls and accessories close to the work.

  • Loaded training equipment
  • Free-weight support
  • Functional storage
  • Fast class reset
Explore system

Project inputs

What we need first.

  1. 01Class format and station sequence
  2. 02Peak class size
  3. 03Lane count / length
  4. 04Movement and loaded-training mix
  5. 05Conditioning station requirements
  6. 06Surface / turf / impact requirements

TORVYR output

What the project brief produces.

  1. 01Station-rotation plan
  2. 02Lane and transition strategy
  3. 03Equipment-family schedule
  4. 04Storage/reset strategy
  5. 05Floor / turf pathway
  6. 06Project brief without third-party affiliation claims

Smart project brief

Start with the facility, not a shopping list.

Send these project details and Apollo can build the first TORVYR equipment-supply scope without forcing unverified models into the proposal.

Facility areaPeak class sizeDesired lane count / lengthTypical station sequenceCurrent equipment / flooringTarget opening or upgrade timing

Specification control

Facility page live. Product approval remains separate.

TORVYR Complete pages describe the project pathway and equipment families. Exact dimensions, capacities, loads, construction, warranty, fixing and certification are released only for the selected products once their technical evidence is approved.

TORVYR COMPLETE

Turn the floor plan into an equipment-supply brief.

Start TORVYR Project Brief
Project