Tennis Performance
Performance-oriented pathway for clubs, academies and projects with defined playing characteristics.
Project configured
Request Project Pricing

Tennis Turf Systems
Commercial artificial tennis turf for clubs, schools, resorts, academies and recreation facilities. Selection is based on playing characteristics, expected use, base condition, drainage, climate, maintenance and any formal court-performance requirement.
Four project pathways
The correct turf is selected around the intended players, operating model and desired court response rather than a single generic tennis specification.
Performance-oriented pathway for clubs, academies and projects with defined playing characteristics.
Project configuredCommercial club pathway balancing court response, durability, utilisation and maintenance.
Project configuredHigh-use pathway for education, community and recreation facilities.
Project configuredHospitality and commercial pathway where presentation, repeat use and operating simplicity are key.
Project configuredSelection logic
Tennis turf should be selected by the required playing feel and court operation, then matched to the base, drainage, climate and maintenance programme.
Performance, club, school, community, resort or recreational use.
Required pace, bounce, traction and player feel.
Daily hours, coaching load, events and public access.
New slab/base, existing court conversion or resurfacing.
Surface falls, permeability strategy and water management.
UV, heat, rainfall, humidity, freeze-thaw and coastal exposure.
Any ITF, consultant or tender performance requirement for the exact surface.

Complete surface system
The selected tennis turf must work with the prepared base, drainage strategy, joint and edge details, line marking and infill where applicable. Court geometry and finished surface tolerances remain part of the wider project scope.
LUTHVAR is supplied on a wholesale and project basis. Civil works, drainage construction, installation, testing and local compliance remain project-specific and are confirmed in the project scope.
Project brief
The playing programme and existing court construction are the starting point for a reliable surface recommendation.
Technical evidence
Where a project requires an ITF, consultant or tender performance classification, the exact proposed surface and supporting current documentation are reviewed before any public or project-specific claim is made. One tested system does not transfer its status to another construction.
Review pile height, proposed playing character and the quoted construction before choosing a project surface. Taishan has confirmed the quoted 12 mm and 15 mm constructions correspond to the referenced ITF court-pace tested systems. Classification is specific to the tested construction, not a guarantee for any new court.
Tennis court settingYF74V1 yarn · 42,000 stitches/m² · sand infill 12 kg/m². The supplied test report records CPR 41 and Category 4 for the tested construction.
Explore 15 mm system →
Tennis court settingFCM80V1 yarn · 52,500 stitches/m² · sand infill 12 kg/m². Taishan confirms the corrected quotation matches the Category 5 tested construction.
Explore 12 mm system →| Property | 15 mm system | 12 mm system |
|---|---|---|
| Pile height | 15 mm | 12 mm |
| Quoted yarn | YF74V1 | FCM80V1 |
| Yarn dtex | 7,400 | 8,000 |
| Stitch density | 42,000/m² | 52,500/m² |
| Stitch rate | 20 / 10 cm | 25 / 10 cm |
| Gauge | 3/16 inch | 3/16 inch |
| Sand infill | 12 kg/m² | 12 kg/m² |
| Quoted colour | Field green | Field green |
| Classified laboratory reference | Category 4 · CPR 41 | Category 5 · CPR 46, matching quoted yarn |
| Current evidence position | Supplier confirms test-system construction matches | Corrected FCM80V1 quotation; supplier confirms match |
Download LUTHVAR Tennis Turf Installation Guide (PDF) →
Apollo NZ Global supplies turf and agreed accessories only; installation and commissioning remain with the project's appointed specialists. Taishan's minimum order is 1,000 m²; roll widths and lengths are project-defined. A manufacturer eight-year warranty letter is provided, with coverage and exclusions subject to the agreed warranty terms.
Request a tennis turf quotation →Tennis project brief
We can then identify the appropriate LUTHVAR tennis pathway and confirm the exact technical configuration at quotation stage.