Skip to main content
Apollo NZ Global
Get a QuoteMy Project
Request Project Pricing
Tennis player on a premium artificial tennis turf court
← Sports Turf Systems
LUTHVAR — Sports & Recreation Systems — People · Places · Performance

Tennis Turf Systems

Tennis turf selected for the way the court will play.

Commercial artificial tennis turf for clubs, schools, resorts, academies and recreation facilities. Selection is based on playing characteristics, expected use, base condition, drainage, climate, maintenance and any formal court-performance requirement.

Four project pathways

Match the surface to the court programme.

The correct turf is selected around the intended players, operating model and desired court response rather than a single generic tennis specification.

01

Tennis Performance

Performance-oriented pathway for clubs, academies and projects with defined playing characteristics.

Project configured
02

Tennis Club

Commercial club pathway balancing court response, durability, utilisation and maintenance.

Project configured
03

Tennis School & Community

High-use pathway for education, community and recreation facilities.

Project configured
04

Tennis Resort & Commercial

Hospitality and commercial pathway where presentation, repeat use and operating simplicity are key.

Project configured

Selection logic

What determines the right tennis turf?

Tennis turf should be selected by the required playing feel and court operation, then matched to the base, drainage, climate and maintenance programme.

Playing level

Performance, club, school, community, resort or recreational use.

Court response

Required pace, bounce, traction and player feel.

Usage intensity

Daily hours, coaching load, events and public access.

Base condition

New slab/base, existing court conversion or resurfacing.

Drainage

Surface falls, permeability strategy and water management.

Climate

UV, heat, rainfall, humidity, freeze-thaw and coastal exposure.

Evidence requirement

Any ITF, consultant or tender performance requirement for the exact surface.

Tennis turf system layers including turf surface, support layers, drainage and prepared base

Complete surface system

Court performance starts below the turf.

The selected tennis turf must work with the prepared base, drainage strategy, joint and edge details, line marking and infill where applicable. Court geometry and finished surface tolerances remain part of the wider project scope.

Supply model

LUTHVAR is supplied on a wholesale and project basis. Civil works, drainage construction, installation, testing and local compliance remain project-specific and are confirmed in the project scope.

Project brief

What we need to review a tennis turf court.

The playing programme and existing court construction are the starting point for a reliable surface recommendation.

01Project country / location02Court count & dimensions03Playing level / programme04Desired playing characteristics05Expected usage intensity06New build or resurfacing07Existing base condition08Drainage / falls09Infill preference where relevant10ITF / consultant / tender requirement11Installation responsibility12Target project timing

Technical evidence

Performance claims stay tied to the exact tennis surface.

Where a project requires an ITF, consultant or tender performance classification, the exact proposed surface and supporting current documentation are reviewed before any public or project-specific claim is made. One tested system does not transfer its status to another construction.

LUTHVAR · Tennis turf range

Two sand-infilled tennis grass specifications.

Review pile height, proposed playing character and the quoted construction before choosing a project surface. Taishan has confirmed the quoted 12 mm and 15 mm constructions correspond to the referenced ITF court-pace tested systems. Classification is specific to the tested construction, not a guarantee for any new court.

Tennis court with synthetic turf playing surfaceTennis court setting
15 mm · Medium-fast reference

15 mm Tennis Grass

YF74V1 yarn · 42,000 stitches/m² · sand infill 12 kg/m². The supplied test report records CPR 41 and Category 4 for the tested construction.

Explore 15 mm system →
Tennis court with synthetic turf playing surfaceTennis court setting
12 mm · Fast-play option

12 mm Tennis Grass

FCM80V1 yarn · 52,500 stitches/m² · sand infill 12 kg/m². Taishan confirms the corrected quotation matches the Category 5 tested construction.

Explore 12 mm system →
Compare quoted tennis grass specifications
Property15 mm system12 mm system
Pile height15 mm12 mm
Quoted yarnYF74V1FCM80V1
Yarn dtex7,4008,000
Stitch density42,000/m²52,500/m²
Stitch rate20 / 10 cm25 / 10 cm
Gauge3/16 inch3/16 inch
Sand infill12 kg/m²12 kg/m²
Quoted colourField greenField green
Classified laboratory referenceCategory 4 · CPR 41Category 5 · CPR 46, matching quoted yarn
Current evidence positionSupplier confirms test-system construction matchesCorrected FCM80V1 quotation; supplier confirms match

Download LUTHVAR Tennis Turf Installation Guide (PDF) →

Apollo NZ Global supplies turf and agreed accessories only; installation and commissioning remain with the project's appointed specialists. Taishan's minimum order is 1,000 m²; roll widths and lengths are project-defined. A manufacturer eight-year warranty letter is provided, with coverage and exclusions subject to the agreed warranty terms.

Request a tennis turf quotation →

Tennis project brief

Send the project conditions before locking the turf.

We can then identify the appropriate LUTHVAR tennis pathway and confirm the exact technical configuration at quotation stage.

Start tennis project brief
Project