Skip to main content
Apollo NZ Global

SPORT + KNOWLEDGE WORKBOOK

All-Season Ski & Freestyle Academy

This workbook mirrors the live Academy. Saved module decisions are inserted automatically; empty modules retain note space for workshops, meetings or site visits.
SPORT + KNOWLEDGE

All-Season Ski & Freestyle Academy

Training terrain and facility planning workbook

LEARN · PLAN · PLAYAn Apollo NZ Global InitiativeReviewed September 2026

How to use this workbook

Work through only the modules relevant to the project. Record confirmed decisions, unresolved questions and information still needed. The live Academy can save the same decisions into Your Facility Plan and My Apollo Project.

This is a planning workbook, not a construction drawing, professional design, accreditation or approval document.

01
MODULE 01

Define the training programme first

WHAT YOU NEED TO DECIDE

Start with disciplines, athlete levels, coaching format and operating hours before deciding what terrain or surface should be built.

INFORMATION TO COLLECT

Is the priority learn-to-ski, moguls, freestyle or a mixed facility?

What athlete levels must the programme support?

How will coaches run sessions and manage progression?

RECORDED DECISION / NOTES
02
MODULE 02

Match terrain to the user level

WHAT YOU NEED TO DECIDE

Use slope gradient, length, transitions and progression zones to support the actual training goal rather than copying a generic ski hill.

INFORMATION TO COLLECT

What skill progression should the terrain support?

Where do beginners, intermediate users and advanced athletes separate?

Is one slope enough or are several zones required?

RECORDED DECISION / NOTES
03
MODULE 03

Plan the synthetic surface as a complete system

WHAT YOU NEED TO DECIDE

Treat the modular surface, supporting base, anchoring, transitions and edge details as one project-specific build-up.

INFORMATION TO COLLECT

What surface pathway fits the intended training use?

What base and anchoring system will support the modules?

How will edges, transitions and replacement areas be handled?

RECORDED DECISION / NOTES
04
MODULE 04

Coordinate drainage and wet-assist services

WHAT YOU NEED TO DECIDE

Plan falls, water movement and any irrigation or misting services before the slope geometry and surface installation are frozen.

INFORMATION TO COLLECT

Will the slope operate dry, wet-assist or snow-over?

Where does water drain at the bottom and edges?

What pumps, water supply or service routes are required?

RECORDED DECISION / NOTES
05
MODULE 05

Design learn-to-ski slopes around coaching

WHAT YOU NEED TO DECIDE

Plan gentle progression, instructor visibility, repeatable routes and safe access so beginner sessions work operationally.

INFORMATION TO COLLECT

Can instructors see and reach learners easily?

How will users return to the top between runs?

Where do equipment handling and waiting areas sit?

RECORDED DECISION / NOTES
06
MODULE 06

Shape mogul terrain around rhythm and repetition

WHAT YOU NEED TO DECIDE

Use bump spacing, line choice, gradient and run-out to support repeatable technique work rather than a one-off feature.

INFORMATION TO COLLECT

What training level controls the mogul geometry?

How much run-in and run-out are required?

Where can coaches observe and give feedback safely?

RECORDED DECISION / NOTES
07
MODULE 07

Plan freestyle as a complete movement path

WHAT YOU NEED TO DECIDE

Coordinate approach, takeoff, landing and run-out as one specialist system rather than treating the jump or landing in isolation.

INFORMATION TO COLLECT

What athlete level and approach speed drive the geometry?

Are takeoff and landing profiles matched?

Is the run-out long and clear enough for the intended use?

RECORDED DECISION / NOTES
08
MODULE 08

Separate advanced performance terrain from general training

WHAT YOU NEED TO DECIDE

Only add cross, half-pipe, big-air or specialist zones where the programme, site and specialist design capability justify them.

INFORMATION TO COLLECT

What discipline and athlete group require the advanced terrain?

Can the site safely support the required geometry?

What specialist design and local engineering input is needed?

RECORDED DECISION / NOTES
09
MODULE 09

Plan safety zones, run-out and circulation

WHAT YOU NEED TO DECIDE

Keep riders, coaches, spectators and service routes separated from active movement zones while preserving clear emergency access.

INFORMATION TO COLLECT

Where are the active run-in, landing and run-out zones?

Can users move between zones without crossing training lines?

Where do coaches, observers and staff stand?

RECORDED DECISION / NOTES
10
MODULE 10

Coordinate support infrastructure and tow pathways

WHAT YOU NEED TO DECIDE

Plan slope access, surface lifts or tow concepts, viewing, fencing, storage and equipment-handling areas as part of the facility.

INFORMATION TO COLLECT

How do users return to the top efficiently?

What support areas are needed for equipment and coaching?

Where do fencing, viewing and service access fit?

RECORDED DECISION / NOTES
11
MODULE 11

Build for maintenance and staged expansion

WHAT YOU NEED TO DECIDE

Protect access to the surface, drainage and services so the facility can be maintained, repaired and expanded as participation grows.

INFORMATION TO COLLECT

How will worn or damaged modules be replaced?

Can drainage and services be accessed without major disruption?

What logical second-stage zones should be protected in the site plan?

RECORDED DECISION / NOTES
12
MODULE 12

Build the all-season ski project brief

WHAT YOU NEED TO DECIDE

Bring programme, slope geometry, surface, drainage, services, safety, support infrastructure and future stages into one coordinated review package.

INFORMATION TO COLLECT

Which disciplines and user levels are confirmed?

Are site geometry, services and run-out constraints documented?

What local civil, structural, safety, installation and approval responsibilities remain outside product supply?

RECORDED DECISION / NOTES

Facility Plan summary

Use this page to consolidate the project before moving into the Sports Project Brief.

Confirmed decisions
Items still to verify
Local professional / approval items
Next planning action
SPORT + KNOWLEDGEapollonzglobal.com/sport-knowledgePlanning guidance · Supply-only project pathway
Return to Academy
Project