3x3 Basketball Academy

This workbook mirrors the live Academy. Saved module decisions are inserted automatically; empty modules retain note space for workshops, meetings or site visits.
SPORT + KNOWLEDGE

3x3 Basketball Academy

Global half-court and event planning workbook

LEARN · PLAN · PLAYAn Apollo NZ Global InitiativeReviewed September 2026

How to use this workbook

Work through only the modules relevant to the project. Record confirmed decisions, unresolved questions and information still needed. The live Academy can save the same decisions into Your Facility Plan and My Apollo Project.

This is a planning workbook, not a construction drawing, professional design, accreditation or approval document.

01
MODULE 01

Start with the FIBA 3x3 playing envelope

WHAT YOU NEED TO DECIDE

Use the official 15 × 11 m court and boundary reference as the sport baseline, then plan the larger operating footprint around it.

INFORMATION TO COLLECT

Is the project competition, school, club, community or event-led?

Is the site a standalone half-court or part of a full basketball court?

What clear area exists beyond the playing boundary?

RECORDED DECISION / NOTES
02
MODULE 02

Define the users and operating model

WHAT YOU NEED TO DECIDE

Match the court to player age, skill, peak occupancy, casual use, coaching, tournaments and public access.

INFORMATION TO COLLECT

Who uses the court most often?

Will formal 3x3 events be hosted?

What operating hours and supervision apply?

RECORDED DECISION / NOTES
03
MODULE 03

Check the base and drainage

WHAT YOU NEED TO DECIDE

Confirm slab or asphalt condition, levels, cracking, water movement and edge conditions before selecting the playing surface.

INFORMATION TO COLLECT

What base exists now?

Does water pond on or beside the court?

Are repairs or local civil works required first?

RECORDED DECISION / NOTES
04
MODULE 04

Choose the surface pathway

WHAT YOU NEED TO DECIDE

Select the playing surface around traction, ball response, outdoor exposure, maintenance, portability and the actual base.

INFORMATION TO COLLECT

Indoor, outdoor or temporary event court?

Permanent, modular or roll-out pathway?

Who will maintain and repair the surface?

RECORDED DECISION / NOTES
05
MODULE 05

Plan the hoop and support structure

WHAT YOU NEED TO DECIDE

Coordinate support type, setback, foundations or anchoring, backboard, rim, padding and maintenance access before the surrounding works are frozen.

INFORMATION TO COLLECT

Fixed, wall-mounted or portable system?

What foundation or structural support is required?

Is safe maintenance access available?

RECORDED DECISION / NOTES
06
MODULE 06

Coordinate markings, shot clock and scoring

WHAT YOU NEED TO DECIDE

Treat court markings and event equipment as part of the facility rather than loose additions.

INFORMATION TO COLLECT

Are official event markings required?

Where will shot clock and scoring equipment sit?

What power, data or operator positions are needed?

RECORDED DECISION / NOTES
07
MODULE 07

Plan lighting around the half-court geometry

WHAT YOU NEED TO DECIDE

Set poles, aiming, glare control and operating hours around the actual hoop, court and surrounding uses.

INFORMATION TO COLLECT

Recreation or competition lighting?

Do poles conflict with run-off or spectators?

Are nearby properties sensitive to spill light?

RECORDED DECISION / NOTES
08
MODULE 08

Plan containment and circulation

WHAT YOU NEED TO DECIDE

Keep ball containment, gates, paths and waiting space outside the active player envelope.

INFORMATION TO COLLECT

Is fencing required?

Where do players enter and wait?

Can spectators reach viewing areas without crossing play?

RECORDED DECISION / NOTES
09
MODULE 09

Add team, spectator and event zones

WHAT YOU NEED TO DECIDE

Allow space for teams, officials, spectators, cameras, hydration and event operations if the court will host organised play.

INFORMATION TO COLLECT

How many spectators are expected?

Where do teams and officials wait?

Is temporary event infrastructure needed?

RECORDED DECISION / NOTES
10
MODULE 10

Plan technology and capture

WHAT YOU NEED TO DECIDE

Coordinate camera positions, score systems, power and data without compromising sightlines or safe movement.

INFORMATION TO COLLECT

Will games be recorded or streamed?

Where can cameras mount safely?

What network and power are available?

RECORDED DECISION / NOTES
11
MODULE 11

Protect future multi-sport use

WHAT YOU NEED TO DECIDE

Decide whether basketball remains the primary layout or must share with netball, futsal, pickleball or school recreation.

INFORMATION TO COLLECT

What other sports are expected?

Which lines should dominate visually?

Can fixed equipment block future use?

RECORDED DECISION / NOTES
12
MODULE 12

Build the 3x3 project brief

WHAT YOU NEED TO DECIDE

Bring users, site, base, surface, hoop, scoring, lighting, containment and event requirements into one project package.

INFORMATION TO COLLECT

Are measured dimensions documented?

Are the FIBA reference and intended competition level clear?

What local works and approvals remain outside supply?

RECORDED DECISION / NOTES

Facility Plan summary

Use this page to consolidate the project before moving into the Sports Project Brief.

Confirmed decisions
Items still to verify
Local professional / approval items
Next planning action