Identify the exact model
Record the model reference and configuration before relying on a certificate, test report or technical schedule.
Start Project BriefWellness Systems · Evidence answer
A factory catalogue is not a complete technical evidence pack. Product evidence should be traceable to the actual model and configuration being quoted.

Record the model reference and configuration before relying on a certificate, test report or technical schedule.
Use current revisions and expiry dates where applicable and retain them with the project record.
Model evidence supports product review; local electrical, building, plumbing and operating requirements remain destination and project specific.
Reference this resource
Link to the live page rather than a saved copy so readers reach the current Apollo planning resource and its latest product and planning links.
apollonzglobal.com/knowledge-centre/wellness/what-evidence-check-before-wellness-equipmentMove from knowledge to project