Skip to main content
Apollo NZ Global

Free public resources · no form · no registration · no purchase required

Practical templates you can actually use on an international development project.

Copy them into your own project system, download them as CSV, or print / save the page as PDF. They are deliberately useful beyond Apollo products and are intended to help project teams produce clearer briefs, supplier comparisons and responsibility schedules.

01Modular Housing Programme RFP Template02International Modular Supplier Due-Diligence Checklist03WASH & Sanitation Facility Briefing Sheet04International Modular Project Responsibility Matrix05Remote & Island Project Logistics Readiness Checklist06Post-Disaster Reconstruction Project Checklist07Community Infrastructure Programme Scope Template

01 · Modular housing RFP

Modular Housing Programme RFP Template

Use this to prepare a supplier brief for permanent or longer-life modular housing. It keeps household mix, engineering criteria, services, local works, documentation and programme scale visible before quotations are compared.

RFP sectionInformation / requirementStatusProject notes / attachment
ProgrammeProject name, country, site, buyer / programme organisation and procurement contact.Open
ProgrammeTotal target units and anticipated phases / batches.Open
Dwelling mixRequired 1-, 2-, 3-, 4+ bedroom and accessible-unit quantities.Open
OccupancyIntended household / workforce type and expected service life.Open
LayoutTarget floor areas, room schedule, storage, laundry and outdoor-living expectations.Open
ClimateHeat, humidity, rainfall, coastal salt, cold or other relevant exposure conditions.Open
HazardsAvailable wind / cyclone, seismic, flood or other project criteria supplied by the project team.Open
StructureRequested storey count, joined-module requirements and any known structural constraints.Open
EnvelopeRoof, wall, insulation, glazing, door and corrosion / finish expectations.Open
ServicesElectrical standard, plumbing, hot water, HVAC intent, communications and factory-completion target.Open
Wet areasBathroom, kitchen and accessible wet-area requirements.Open
FoundationsKnown ground information and party responsible for local foundation design / construction.Open
UtilitiesWater, wastewater, stormwater, power and site-connection responsibility.Open
Technical documentsRequired CAD / BIM, structural information, fire / thermal evidence, manuals and QA records.Open
LogisticsReceiving port, inland destination, road limits, unloading / crane capability and storage conditions.Open
InstallationLocal labour capability, supervision requirements and assembly responsibility.Open
Programme capacityRequired pilot / first batch and target production volumes for later phases.Open
Commercial returnRequired Incoterm / handover point, warranty, spares, quote validity and tender return format.Open

Unknown items should stay visible as open rather than being replaced with supplier assumptions. Local law, project standards and appointed professionals control the final requirements.

02 · Supplier due diligence

International Modular Supplier Due-Diligence Checklist

Use this before relying on a modular-building manufacturer for a funded housing, WASH, health, education or community-infrastructure programme.

Review areaQuestion / evidence requiredStatusNotes / evidence reference
Legal identityConfirm legal manufacturer, contracting entity, factory address and trading names.Open
FactoryConfirm production site, production lines and whether key fabrication is in-house.Open
EngineeringCan the exact proposed system be supported with drawings and calculations where required?Open
Standard productsList standard module widths, lengths, heights, joining methods and storey limits.Open
MaterialsConfirm structural materials, coatings, wall / roof build-ups and standard component specifications.Open
FireRequest current fire-performance information applicable to the proposed materials and build-up.Open
ThermalRequest insulation / thermal information for the proposed wall and roof configuration.Open
Wind / seismicRequest system-specific engineering evidence and clarify project-specific design process.Open
CorrosionConfirm coastal / high-corrosion options, coatings, fixings and maintenance requirements.Open
MEPConfirm factory-installed electrical / plumbing scope and HVAC interfaces.Open
QA / QCRequest production inspection process, records, tolerances and non-conformance handling.Open
CapacityConfirm realistic monthly capacity and proposed allocation for 100 / 500 / 1,000+ unit programmes.Open
ReferencesRequest comparable completed projects with location, quantity, use and permission to reference.Open
DocumentationConfirm CAD / BIM, shop drawings, calculations, manuals, packing records and handover documents.Open
PackingConfirm units / components per container, weights, package dimensions and loading method.Open
InstallationConfirm manuals, training, supervision and local-contractor requirements.Open
Warranty / sparesConfirm warranty process, replacement parts, recommended spares and after-sales route.Open
TerritoryConfirm any protected distributors, country restrictions or sales limitations.Open

This checklist organises supplier due diligence; it does not certify a manufacturer. Evidence should match the exact system, configuration and current project.

03 · WASH facility brief

WASH & Sanitation Facility Briefing Sheet

Use this before designing or procuring modular toilets, showers, washing, changing or accessible sanitary facilities.

Briefing areaInformation to confirmStatusProject notes
UsersExpected daily users, peak users and operating hours.Open
User groupsAdults / children / staff / public / residents and any privacy or safeguarding requirements.Open
AccessibilityRequired accessible toilets, showers, routes, thresholds and circulation.Open
ToiletsFixture quantity and type required by the applicable project / local standard.Open
ShowersShower quantity, privacy, changing and dry-zone requirements.Open
HandwashingBasin quantity, soap / drying provision and hygiene requirements.Open
Water sourceSource, quality, pressure, storage and reliability.Open
Hot waterDemand, heating method, energy source and recovery requirement.Open
WastewaterSewer, septic, treatment, holding or other disposal pathway.Open
DrainageFloor drainage, external stormwater and overflow strategy.Open
VentilationNatural / mechanical ventilation and humidity control.Open
FinishesCleanable wall, floor, ceiling and wet-area finish requirements.Open
CleaningCleaning frequency, chemical exposure, cleaner storage and service access.Open
MaintenanceValve, trap, panel, fixture and replacement-parts access.Open
Factory scopeWhich fixtures, plumbing and electrical items should be installed before shipment?Open
Local scopeExternal water, wastewater, power, foundations and final connections.Open
HandoverTesting, manuals, spare fixtures / parts and cleaning / maintenance information.Open

Fixture counts and public-health requirements should follow the applicable project standards, humanitarian guidance and local law. This sheet is an early briefing tool.

04 · Responsibility matrix

International Modular Project Responsibility Matrix

Assign each interface before manufacture so supplier, buyer and local project teams do not assume another party owns the work.

Scope itemManufacturer / supplierBuyer / programme teamLocal engineer / contractorFinal owner / notes
Project criteriaProvide required system inputs / limitsIssue destination and programme criteriaConfirm local design criteria
Shop drawingsPrepare agreed manufacturing / assembly drawingsReview commercial scopeReview local interfaces where appointed
Structural informationProvide agreed system calculations / reactions where includedProvide project inputsLocal review / foundation design / sign-off as applicable
FoundationsProvide reactions / interface information where availableDefine scopeDesign and construct unless separately contracted
Manufactured buildingManufacture agreed packageApprove releaseReceive and verify interfaces
Internal electricalProvide agreed factory scopeConfirm electrical standardComplete local connections / certification
Internal plumbingProvide agreed factory scopeConfirm fixture / service briefComplete local connections / testing
External utilitiesProvide connection requirementsCoordinate utility ownersConstruct and connect
Packing / export docsPrepare agreed export packageConfirm consignee / import dataReceive project information as needed
International freightAs agreed by Incoterm / contractAs agreed by Incoterm / contractSupport receiving logistics if assigned
Customs / importProvide supplier documentsOwn / appoint importer unless contracted otherwiseSupport local permits if appointed
Unloading / storageProvide handling guidanceArrange receiving scopeExecute safe unloading / storage if appointed
AssemblyProvide manuals / supervision if contractedAppoint delivery teamExecute site assembly / temporary works
Testing / commissioningFactory checks within supply scopeCoordinate programme acceptanceCommission local services / systems as assigned
ApprovalsSupply supporting product documentsCoordinate statutory pathwayLocal professionals / authorities review and approve
HandoverIssue agreed manuals, warranty, spares and recordsAccept and retain project recordsClose local works and commissioning records

The contract, Incoterm, local law and professional appointments take precedence. This matrix is intended to expose scope gaps before they become site problems.

05 · Remote logistics

Remote & Island Project Logistics Readiness Checklist

Use this before freezing module dimensions or packaging for island, rural or difficult-access projects.

Logistics stageQuestion / requirementStatusOwner / notes
OriginFactory location and export port confirmed.Open
PackingProposed flat-pack / detachable / complete-module packing method confirmed.Open
ContainerisationUnits per 20ft / 40ft / 40HQ or break-bulk requirement confirmed.Open
WeightsPackage and lifting weights supplied.Open
Destination portPort can handle proposed container / cargo type.Open
ImportImporter, customs process, duties / exemptions and documentation owner confirmed.Open
Port storageFree time, storage risk and weather protection considered.Open
Onward routeRoad, ferry, bridge, corner, height, width and weight restrictions checked.Open
Site accessFinal road / track and delivery vehicle access checked.Open
UnloadingCrane, forklift or other equipment type and capacity confirmed.Open
LaydownDry, secure storage / assembly area available.Open
WeatherRain, salt, heat, wind and storage exposure considered during delivery.Open
Assembly labourLocal labour / contractor capability and supervision requirements confirmed.Open
Tools / equipmentRequired tools, access equipment and temporary supports available.Open
Critical sparesHigh-risk / difficult-to-replace components identified for spare shipment.Open
Damage processInspection, photos, shortage / damage reporting and replacement route defined.Open
PhasingShipment sequence matches foundation / site readiness and local storage capacity.Open

Remote logistics should influence system selection before production drawings are frozen, not after the building has already been designed.

06 · Reconstruction

Post-Disaster Reconstruction Project Checklist

Use this to structure the move from immediate response into durable housing and community infrastructure after cyclone, hurricane, earthquake, flood or other major disruption.

Recovery areaQuestion / actionStatusProgramme notes / owner
Recovery stageIs the project immediate shelter, transitional infrastructure or permanent reconstruction?Open
PopulationAffected households / users and current location confirmed.Open
Land / siteLand availability, tenure / permission and safe-site assessment confirmed by responsible parties.Open
HazardKnown recurring hazard and project design criteria identified.Open
HousingRequired permanent / transitional dwelling mix and quantities defined.Open
WASHWater, toilets, showers, wastewater and hygiene infrastructure needs mapped.Open
HealthFirst-aid / clinic and health-service infrastructure need mapped.Open
EducationTemporary / replacement classrooms and school amenities mapped.Open
CommunityAdministration, meeting, public-space and other community functions mapped.Open
UtilitiesStatus of water, wastewater, power and communications infrastructure assessed.Open
TransportPort, road, bridge, ferry and site access damage / capacity assessed.Open
Local capacityAvailable trades, contractors, equipment and assembly skills identified.Open
StandardsApplicable humanitarian, donor, reconstruction and local statutory requirements identified.Open
Supplier evidenceProposed systems supported by project-relevant technical information.Open
PhasingCritical-service buildings and first housing phases prioritised.Open
MaintenanceLocal ownership, spare parts, manuals and future repair pathway defined.Open
HandoverInspection, commissioning, records, training and acceptance process defined.Open

Do not treat 'rapid deployment' as proof of suitability for permanent reconstruction. The intended service life, hazard, local requirements and maintenance pathway must be confirmed.

07 · Community programme

Community Infrastructure Programme Scope Template

Use this to map a development programme that includes more than housing, so health, education, sanitation, administration, recreation and operations are not left until later.

Programme functionQuantity / capacityKey rooms / systemsLocal interfaceNotes / priority
HousingDwelling mix, accessibility, household needsFoundations, utilities, roads
WASH / sanitationToilets, showers, handwashing, laundryWater, wastewater, drainage
HealthFirst aid, consultation, waiting, sanitationHealth requirements, utilities
EducationClassrooms, staff, administration, storageCampus access, utilities
AdministrationReception, offices, meeting, recordsCommunications, security
Community gatheringHall / meeting / shaded gatheringPublic access, fire, amenities
Sport / recreationCourts, equipment, shade, lighting, seatingCivil works, power, maintenance
Public realmSeating, waste, hydration, wayfinding, shadeFoundations, landscape, maintenance
OperationsStorage, workshop, maintenance, securityService access, power
UtilitiesWater, wastewater, energy, communicationsLocal infrastructure / operators
LogisticsReceiving, storage, lifting, assemblyPort, road, local contractor
HandoverManuals, spares, training, recordsLocal owner / operator

This template is intentionally cross-disciplinary. Each function still requires its own technical brief, applicable standards and local professional review.

Free to use as a working reference

Useful first. Commercial second.

No lead gate

No form, email address or purchase is required to use, copy, print or download the templates.

Keep unknowns visible

The templates deliberately include status and notes fields so unresolved project issues do not disappear into assumptions.

Link to the current version

If sharing the resource online, link to this live page so other users reach the current template and supporting guidance.

Need the reasoning behind the checklist?

Use the free guides alongside the working templates.

The Development & Humanitarian Infrastructure Knowledge Centre explains why these fields matter and links to relevant official humanitarian, WASH and procurement starting points.

Open Knowledge Centre
Project