SOLVARN · SPECIFICATION STARTER
Solar Outdoor Systems
Use this as a controlled starting point for consultant coordination, tender preparation and project review. Replace planning language with exact project/system information before procurement.
APOLLO NZ GLOBAL · WHOLESALE & PROJECT SUPPLY
SOLVARN
Solar Outdoor Systems
- Project
- ________________
- Destination
- ________________
- Status
- Concept / tender starter
- Review
- 05 Oct 2026
PROJECT INTENT / TECHNICAL INPUTS
- Destination and solar/climate conditions
- 3 × 3 to 4 × 6 m footprint / location
- Orientation, shading and seasonal solar exposure
- LED, pergola motor and auxiliary AC/DC loads
- Continuous/surge load profile and operating hours
- Battery reserve, low-state-of-charge behaviour and resilience objective
- Mains charging availability and destination electrical standard
- Wind criteria, foundations, drainage, coastal/corrosive exposure and service access
PERFORMANCE / SPECIFICATION CLAUSES
- Footprint and architectural configuration
- PV module layout/orientation
- Battery/BMS architecture
- Inverter and load schedule
- Control priorities and low-battery behaviour
- Mains-charge interface if selected
- Wind/foundation/site drainage criteria
- Ingress/corrosion/environmental requirements
- Monitoring, maintenance and replacement access
REQUIRED EVIDENCE / SUBMITTALS
- Exact PV module and array data
- Exact LiFePO4 battery/BMS documentation
- Inverter continuous/surge and environmental rating
- Exact ingress-protection evidence for installed components
- Pergola motor/control documentation
- Structural/wind evidence tied to the selected configuration
- Electrical protection/earthing documentation for any mains interface
DRAWING / CAD / BIM REGISTER
- Solar outdoor concept / planning layout — Public planning: Early scope, interface and consultant coordination only.
- Generic technical reference / typical detail — Public planning: Explains system logic without representing an exact supplied configuration.
- Exact-system GA / dimensional drawing — Exact-system: Issued only after the quoted system/configuration is known.
- Native CAD / DWG / DXF — Verify availability: Availability and revision must be confirmed against the exact supplied system.
- BIM / Revit / IFC object — Verify availability: Only described as BIM where a genuine verified native model exists.
- Foundation / fixing / setting-out drawing — Project-specific: Depends on site/building conditions, local engineering and the selected system.
- Services / electrical / controls interface — Project-specific: Coordinates the supplied system with local power, data, water, drainage or controls.
TENDER / BIDDER RETURN SCHEDULE
- Site location / coordinates
- Chosen footprint
- Solar/shading information
- Load and operating-hour schedule
- Battery/resilience objective
- Mains backup requirement
- Wind/foundation criteria
- Environmental exposure
- Electrical/controls interface
- Evidence and handover schedule
OPERATIONS / MAINTENANCE / HANDOVER
- PV cleaning / shading inspection
- Battery health / BMS alarm review
- Inverter/controls fault log
- Cable/gland/enclosure inspection
- Pergola motor / moving-part maintenance
- Drainage and structure inspection
- LED / auxiliary-load check
- Battery/inverter replacement access plan
Supply boundary
Apollo NZ Global is Wholesale & Project Supply and supply-only. Local professional design, engineering, civil works, electrical work, installation, statutory approvals, commissioning and operational responsibilities remain with the appointed project parties unless expressly included in writing.
Use: planning/specification starter only. Exact selected-system evidence, current drawings and destination requirements take precedence.
NEXT STEP
