Skip to main content
Apollo NZ GlobalStart Exact Project Brief

ARKEN · CADARN · VARDHUS · SPECIFICATION STARTER

Outdoor Architecture Systems

Use this as a controlled starting point for consultant coordination, tender preparation and project review. Replace planning language with exact project/system information before procurement.

APOLLO NZ GLOBAL · WHOLESALE & PROJECT SUPPLY

ARKEN · CADARN · VARDHUS

Outdoor Architecture Systems

Project
________________
Destination
________________
Status
Concept / tender starter
Review
05 Oct 2026
01

PROJECT INTENT / TECHNICAL INPUTS

  1. Destination and permitted product pathway
  2. Overall footprint, bays and required clear spans
  3. Wall-mounted/freestanding/site interfaces
  4. Local wind, snow where relevant and exposure category
  5. Roof type, opening behaviour and rainwater strategy
  6. Post height / site falls / slab levels
  7. Screens, doors, lighting and accessory requirements
  8. Foundation/fixing, power/controls, freight and installation responsibility
02

PERFORMANCE / SPECIFICATION CLAUSES

  1. System pathway and procurement model
  2. Plan geometry / bay arrangement / clear span
  3. Posts, beams and roof configuration
  4. Wind/site criteria and local structural design
  5. Rainwater/drainage strategy
  6. Motor/controls/electrical interfaces
  7. Screens/doors/accessories
  8. Finish/coastal/environment requirements
  9. Foundations/fixings/installation boundary
03

REQUIRED EVIDENCE / SUBMITTALS

  1. Exact aluminium/steel/material specification
  2. Exact structural/span/wind evidence for selected configuration
  3. Motor/control documentation where powered
  4. Drainage/gutter/downpipe details
  5. Screen/door/accessory compatibility
  6. Coating/finish and coastal/environment evidence
  7. Exact-system drawings, warranty and maintenance requirements
04

DRAWING / CAD / BIM REGISTER

  1. Pergola / outdoor-architecture concept / planning layout — Public planning: Early scope, interface and consultant coordination only.
  2. Generic technical reference / typical detail — Public planning: Explains system logic without representing an exact supplied configuration.
  3. Exact-system GA / dimensional drawing — Exact-system: Issued only after the quoted system/configuration is known.
  4. Native CAD / DWG / DXF — Verify availability: Availability and revision must be confirmed against the exact supplied system.
  5. BIM / Revit / IFC object — Verify availability: Only described as BIM where a genuine verified native model exists.
  6. Foundation / fixing / setting-out drawing — Project-specific: Depends on site/building conditions, local engineering and the selected system.
  7. Services / electrical / controls interface — Project-specific: Coordinates the supplied system with local power, data, water, drainage or controls.
05

TENDER / BIDDER RETURN SCHEDULE

  1. Site / building drawings
  2. Dimensions / bay layout
  3. Wind/site criteria
  4. Roof/drainage requirements
  5. Accessories / screens / doors
  6. Finish/colour
  7. Power/controls
  8. Foundation/fixing responsibility
  9. Freight/site access
  10. Exact evidence and drawings
06

OPERATIONS / MAINTENANCE / HANDOVER

  1. Roof/moving-component inspection
  2. Drainage/gutter/downpipe cleaning
  3. Fastener/connection visual inspection
  4. Motor/control maintenance
  5. Screens/doors/accessory service
  6. Coating/corrosion inspection
  7. Seal/weather-interface check
  8. Storm/high-wind operating procedure

Supply boundary

Apollo NZ Global is Wholesale & Project Supply and supply-only. Local professional design, engineering, civil works, electrical work, installation, statutory approvals, commissioning and operational responsibilities remain with the appointed project parties unless expressly included in writing.

Use: planning/specification starter only. Exact selected-system evidence, current drawings and destination requirements take precedence.

NEXT STEP

Check actual document availability before issuing the pack as an exact product requirement.

Evidence / CAD Matrix
Project